The building package

The shell covers structure, insulation, windows, doors and exterior finish. On a 400 to 800 square foot unit this is where the visible quality lives, and it is the part a factory can hold to a fixed price.

أبرز النقاط
  • The building itself is usually 45–60% of an installed ADU.
  • Site work and utility connections are the least predictable line item.
  • Getting the shell off-site is the single largest cost lever you control.

Fit-out — kitchen, bath, flooring, cabinetry — typically adds 25 to 35% on top of the shell if you buy it as a package rather than sourcing locally.

Site work and utilities

Excavation, a trench to the main service, a new electrical panel and a sewer or septic connection can each surprise you. Ask for a site survey before signing anything; the number that matters is the distance from the unit to the existing service entry.

Foundations are commonly a pier-and-beam system for prefab, which is cheaper and faster than a full slab but needs engineering sign-off in frost zones.

Permits, fees and soft costs

Plan check, school fees and utility connection charges are jurisdiction-specific and rarely negotiable. Budget them as a contingency rather than a fixed line.

Design and engineering fees are usually included when you buy from a manufacturer that stamps its own drawings — a real saving versus assembling a local design team.

Want this applied to your site?

Send us your location, target size and budget range. A project advisor will reply within one business day.

Get a free recommendation →

Built to order
Need something we do not list? We can build it.
Custom layouts, sizes, cladding and full turnkey fit-out.
Describe your project
توماس بيرغ
بقلم

توماس بيرغ — Structural & Compliance Lead

Structural engineer by training, code translator by necessity. Tomas maps every model against IRC, Eurocode, EN and NCC requirements before it reaches the production line.

View profile & all articles →