Days one and two

Offloading dominates. Panels are numbered and stacked in reverse order of use, so the first hour is usually spent moving the last boxes out of the way.

أبرز النقاط
  • Weathertight in three to five days is realistic for a trained crew.
  • Lifting equipment is the gating resource, not labour.
  • The first day is consumed by offloading and sorting.

By the end of day one a good crew has the floor cassettes down and squared. Day two is walls, bracing and the first pass at alignment — do not skip the diagonal measurements.

Days three to five

Roof structure and covering follow, then windows and doors. This is when the building becomes weathertight and the schedule risk drops sharply.

Allow half a day for the airtightness tape and membrane detailing. It is invisible work with the biggest effect on how the finished house performs.

Where days disappear

Missing fixings, a telehandler that arrives a day late, and site access that requires moving a delivery twice. Confirm the lifting plan in writing before the container ships.

Ground conditions are the other variable. A level, compacted pad removes a whole day of shimming and re-levelling.

Want this applied to your site?

Send us your location, target size and budget range. A project advisor will reply within one business day.

Get a free recommendation →

Built to order
Need something we do not list? We can build it.
Custom layouts, sizes, cladding and full turnkey fit-out.
Describe your project
Elena Marsh
بقلم

Elena Marsh — Head of Design

Leads the design studio at Velaroom. Fourteen years detailing modular and volumetric housing for clients in Europe, North America and Australia, with a focus on layouts that survive a forty-foot container.

View profile & all articles →