On the floor
Watch how panels are stored. Flat-stacked frames with no support lose tolerance before they reach the jig, and that error appears later as a door that does not close.
- Ask to see a unit mid-production, not a finished show unit.
- Check how modules are protected during storage and transport.
- Photo-documented QC at fixed milestones beats a certificate on the wall.
Look at the jigs themselves. A factory using fixed jigs with regular calibration checks produces repeatable modules; one relying on tape measures and site skill does not.
Quality records
Ask for a QC plan with named hold points: frame weld inspection, insulation check, MEP pressure test, glazing installation. Each should have a signed record per unit, not per batch.
Request one anonymised QC pack for a past project. It tells you more than any brochure about how the factory really works.
Transport protection
Modules spend weeks in transit and on site before installation. Corner protection, membrane sealing and internal bracing are the difference between a factory finish and a repair list.
Ask who inspects on arrival and how damage is recorded. A clear arrival protocol prevents the argument about where a dent came from.
Send us your location, target size and budget range. A project advisor will reply within one business day.

