Matching foundation to frame
A volumetric module transfers load at defined points, so piers under those points are efficient. A slab spreads load but brings concrete curing time and a wet trade onto a site chosen for speed.
- Prefab generally favours point loads over a full slab.
- Screw piles cut site time on soft ground but need verification testing.
- Frost depth and drainage decide the final detail.
Panelised buildings behave differently: they distribute load along the perimeter, which often suits a shallow strip or a stiffened raft.
Screw piles and helical systems
Helical piles install in hours with no spoil and no curing, which is why they dominate on remote and sloping sites. Each pile needs a torque reading recorded to confirm capacity.
On variable ground, allow for a verification pile and a possible increase in length. That is the main cost uncertainty with this method.
Drainage and detail
Keep the underside of a suspended unit ventilated and dry. Standing water under a building is the most common cause of premature corrosion on steel-framed units.
Finish the ground with a fall away from the structure and a free-draining apron. It costs little and protects the most expensive part of the building.