A620 Attached ADU Suite
An attached ADU shares a wall with the main house, which reduces the foundation and envelope cost compared with a freestanding unit.
- Structure: Steel frame with shared wall
- Insulation: Mineral wool 140 mm · R-30
- Deploy: 3 days
- Warranty: 10-year structural
- Rating: 4.7 · 18+ installs
اختر تكوينًا
شاهد A620 أثناء العمل
Site installation
An attached ADU shares a wall with the main house, which reduces the foundation and envelope cost compared with a freestanding unit.
The acoustic detail is the specification that decides whether the arrangement works for two households. Our standard wall assembly uses separated studs and a mineral wool cavity.
Because the unit ties into the existing structure, the junction detailing is designed per project after a survey of the existing wall and roof.
| المساحة الداخلية | 62 m² |
|---|---|
| ارتفاع السقف | 2.7 m |
| Foundation | Strip footing |
| Glazing | Double, low-E |
| Acoustic separation | Rw 55 dB |
| Shared wall | Double-stud acoustic |
Included as standard
- هيكل حديدي
- Insulated wall panels
- Windows and doors
- Exterior cladding
- Delivery to port
- Kitchen and appliances
- Bathroom fit-out
- الديكور الداخلي
Units ship from our own facility. Typical lead time is 10 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.
Manufacture 10 weeks · freight 3–5 weeks
How is noise handled?
A double-stud wall with a mineral wool cavity achieves Rw 55 dB, which is above the usual residential requirement.
Does it need its own entrance?
For rentable use, yes. Most designs include an external door and a small covered porch.
Tell us your project.
سنقوم quote in 24 hours.
أخبرنا بطبيعة الموقع والجدول الزمني والتكوين، وسنرسل لك ملاحظات أولية عن الجدوى وميزانية تقديرية ومن نموذج إلى ثلاثة نماذج موصى بها.