Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →
Model F900 · Flat Pack

F900 Flat Pack Container Home

4.7 · 25+ installs

Flat packing is about freight economics. A complete three-bedroom home travels as two container loads, which is often less than a quarter of the volume of the same building shipped assembled.

Why this home
  • Structure: Bolted steel frame
  • Insulation: Glass wool 100 mm · R-26
  • Deploy: 3 days
  • Warranty: 10-year structural
  • Rating: 4.7 · 25+ installs
المساحة الداخلية
74 m²
Bedrooms
3
الحمامات
1
Deployment
3 days
Structure
Bolted steel frame
Insulation
Glass wool 100 mm · R-26

اختر تكوينًا

From $52,900 من المصنع مباشرة · عرض سعر تقديري خلال 24 ساعة
CE & ISO 9001 10-year structural warranty تُشحن إلى جميع أنحاء العالم
Watch

شاهد F900 أثناء العمل

Velaroom demo visual 05 Site installation

Flat packing is about freight economics. A complete three-bedroom home travels as two container loads, which is often less than a quarter of the volume of the same building shipped assembled.

Assembly follows a numbered sequence: floor cassettes, walls, roof, then services. The frame uses bolted connections throughout, so no site welding is required.

This model appeals to buyers in island and inland markets where road access makes a volumetric delivery impractical, but where a small competent crew is available.

F900 Flat Pack Container Home — Specifications
المساحة الداخلية74 m²
ارتفاع السقف2.7 m
RoofCorrugated steel, ventilated
Glazingمزدوج، معزول حراريًا
Container load2 units per 40 ft
وقت التجميع3 days, 4 crew

Included as standard

  • هيكل حديدي
  • Insulated wall panels
  • Windows and doors
  • Exterior cladding
  • Delivery to port
  • Kitchen and appliances
  • Bathroom fit-out
  • الديكور الداخلي

Units ship from our own facility. Typical lead time is 8–10 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.

Typical lead time

Manufacture 8–10 weeks · freight 3–5 weeks

Can two units be stacked?

Yes, with the corner castings joined and a structural check on the lower unit. The standard design is single storey.

What tools are needed on site?

محركات تأثير،(level ليزر دوّار) ورافعة بعجلة. تأتي مع الجهاز حزمة تشغيل كاملة.

Tell us your project.
سنقوم quote in 24 hours.

أخبرنا بطبيعة الموقع والجدول الزمني والتكوين، وسنرسل لك ملاحظات أولية عن الجدوى وميزانية تقديرية ومن نموذج إلى ثلاثة نماذج موصى بها.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — F900