Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →
Model V210 · Villa

V210 Steel Structure Villa

4.9 · 9 builds

The V210 is a hot-rolled steel villa frame for projects where long spans and large openings are the design driver.

Why this home
  • Structure: Hot-rolled steel frame
  • Insulation: External PIR 100 mm · R-30
  • Deploy: 7 days
  • Warranty: 10-year structural
  • Rating: 4.9 · 9 builds
المساحة الداخلية
210 m²
Bedrooms
4
الحمامات
3
Deployment
7 days
Structure
Hot-rolled steel frame
Insulation
External PIR 100 mm · R-30

اختر تكوينًا

On application من المصنع مباشرة · عرض سعر تقديري خلال 24 ساعة
CE & ISO 9001 10-year structural warranty تُشحن إلى جميع أنحاء العالم

The V210 is a hot-rolled steel villa frame for projects where long spans and large openings are the design driver.

Clear spans up to 9.5 metres let the living space run the full width of the house without internal columns, which is difficult to achieve in timber.

We deliver the engineered frame, envelope and services first fix; second fix and finishes are usually awarded to local trades selected by the client.

V210 Steel Structure Villa — Specifications
المساحة الداخلية210 m²
Floors2
GlazingAluminium, triple
SpansUp to 9.5 m clear
StructuralEN 1090 EXC2 or EXC3
FinishArchitect specified

Included as standard

  • هيكل حديدي
  • Insulated wall panels
  • Windows and doors
  • Exterior cladding
  • Delivery to port
  • Kitchen and appliances
  • Bathroom fit-out
  • الديكور الداخلي

Units ship from our own facility. Typical lead time is 14–16 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.

Typical lead time

Manufacture 14–16 weeks · freight 3–5 weeks

Can the design be customised?

Yes. The frame is engineered to the architect scheme, and cladding, glazing and internal layout are all project specific.

How is the roof finished?

Standing seam metal, membrane or tile on battens — the frame accepts all three with the appropriate substrate.

Tell us your project.
سنقوم quote in 24 hours.

أخبرنا بطبيعة الموقع والجدول الزمني والتكوين، وسنرسل لك ملاحظات أولية عن الجدوى وميزانية تقديرية ومن نموذج إلى ثلاثة نماذج موصى بها.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — V210