Sixteen pods on a ski resort site with severe winter conditions and a compressed installation window between seasons.
Roof structures were engineered for 3.2 kPa of snow, above the local minimum, and detailed with a steep pitch that sheds snow clear of entrances.
Installation ran in early winter with heated temporary enclosures around connection works, which kept the programme intact without risking the finishes.
Send us your site plan and unit count. We'll return a master-plan concept, a repeatable model and an indicative budget.