Now shipping to 40+ countries · CE & ISO-certified, factory-direct Recibe tu presupuesto en 24 h →
Model A560 · ADU

A560 Two-Bed Detached ADU

4.8 · 35+ installs

The A560 adds a second bedroom and a slightly larger living space, which is usually the difference between accommodation for one person and accommodation for a small household.

Why this home
  • Structure: Steel frame, cold-formed
  • Insulation: Mineral wool 140 mm · R-30
  • Deploy: 2 days
  • Warranty: 10-year structural
  • Rating: 4.8 · 35+ installs
Superficie interior
56 m²
Bedrooms
2
Baños
1
Deployment
2 días
Structure
Estructura de acero, conformado en frío
Insulation
Mineral wool 140 mm · R-30

Elige una configuración

From $54,800 Precio de fábrica · presupuesto orientativo en 24 h
CE & ISO 9001 10-year structural warranty Envíos a todo el mundo

The A560 adds a second bedroom and a slightly larger living space, which is usually the difference between accommodation for one person and accommodation for a small household.

Both bedrooms are sized to take a double bed with circulation space on three sides, and the bathroom is accessible from the hallway rather than through a bedroom.

For rental use, the model is often specified with a laundry connection and a storage cupboard by the entrance — small additions that consistently appear in longer tenancies.

A560 Two-Bed Detached ADU — Specifications
Superficie interior56 m²
External size11.0 × 5.2 m
Altura del techo2.7 m
Bedrooms2 (3.4 × 3.2 m each)
FoundationPier and beam
GlazingTriple, argon-filled

Included as standard

  • Estructura portante
  • Insulated wall panels
  • Windows and doors
  • Exterior cladding
  • Delivery to port
  • Kitchen and appliances
  • Bathroom fit-out
  • Decoración de interiores

Units ship from our own facility. Typical lead time is 9 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.

Typical lead time

Manufacture 9 weeks · freight 3–5 weeks

Does a two-bedroom ADU rent better?

In most markets it commands 20 to 30% more than a studio while costing about a third more to build.

Is a second bathroom available?

Yes, as a factory option. It changes the internal layout, so it must be specified before production.

Tell us your project.
Te quote in 24 hours.

Cuéntanos dónde está tu parcela, tus plazos y la configuración que quieres, y te enviaremos una nota de viabilidad, un presupuesto orientativo y de uno a tres modelos recomendados.

Respondemos en un día laborable NDA on request English · German · French · Spanish

Request a quote — A560