Model U40 · Sanitary

U40 Camping Sanitary Block

4.7 · 31 installs

The U40 is a self-contained sanitary block for campsites, glamping clusters and remote worker accommodation.

Why this home
  • Structure: Steel frame, composite wet walls
  • Insulation: PIR 75 mm · R-20
  • Deploy: 2 days
  • Warranty: 10-year structural
  • Rating: 4.7 · 31 installs
Superficie interior
40 m²
Baños
8
Deployment
2 días
Structure
Steel frame, composite wet walls
Insulation
PIR 75 mm · R-20

Elige una configuración

From $56,700 Precio de fábrica · presupuesto orientativo en 24 h
CE & ISO 9001 10-year structural warranty Envíos a todo el mundo
Watch

Descubre U40 en acción

Velaroom demo visual 06 Assembly in 60 seconds

The U40 is a self-contained sanitary block for campsites, glamping clusters and remote worker accommodation.

Four showers, four WC cubicles and four basins are arranged around a heated service zone so all pipework stays accessible for maintenance.

Water heating uses a heat pump with a 300-litre store, sized for peak morning demand rather than average use.

U40 Camping Sanitary Block — Specifications
Superficie interior40 m²
Showers4
WC cubicles4
Washbasins4
Water heatingHeat pump, 300 L
DrainageSingle connection, 110 mm

Included as standard

  • Estructura portante
  • Insulated wall panels
  • Windows and doors
  • Exterior cladding
  • Delivery to port
  • Kitchen and appliances
  • Bathroom fit-out
  • Decoración de interiores

Units ship from our own facility. Typical lead time is 9 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.

Typical lead time

Manufacture 9 weeks · freight 3–5 weeks

Can it work off mains drainage?

Yes, with a treatment unit sized for peak occupancy. The building itself is unchanged.

Is it frost protected?

Yes, the pipework runs in a heated service zone, and the unit can be specified for a cold climate.

Tell us your project.
Te quote in 24 hours.

Cuéntanos dónde está tu parcela, tus plazos y la configuración que quieres, y te enviaremos una nota de viabilidad, un presupuesto orientativo y de uno a tres modelos recomendados.

Respondemos en un día laborable NDA on request English · German · French · Spanish