Now shipping to 40+ countries · CE & ISO-certified, factory-direct Obtenir un devis en 24 h →
Model G520 · Gym

G520 Backyard Gym Pod

4.7 · 20+ installs

The G520 takes the S240 shell and adds a reinforced floor, higher ceiling and mechanical ventilation sized for a workout space.

Why this home
  • Structure: Steel frame, reinforced floor
  • Insulation: Mineral wool 100 mm · R-24
  • Deploy: 1 day
  • Warranty: 10-year structural
  • Rating: 4.7 · 20+ installs
Surface intérieure
31 m²
Salles de bain
1
Deployment
1 day
Structure
Steel frame, reinforced floor
Insulation
Laine minérale 100 mm · R-24

Choisir une configuration

From $26,400 Factory-direct · indicative quote within 24h
CE & ISO 9001 10-year structural warranty Livraison mondiale

The G520 takes the S240 shell and adds a reinforced floor, higher ceiling and mechanical ventilation sized for a workout space.

Ventilation is the specification most people forget. Four air changes per hour keeps humidity and odour under control without opening the door in winter.

It can be supplied with a small shower room, which in practice doubles the number of people who will use it regularly.

G520 Backyard Gym Pod — Specifications
Surface intérieure31 m²
Ceiling height2.9 m
Floor loading5.0 kN/m²
GlazingDouble, obscured to 1.2 m
PowerDedicated 40 A circuit
VentilationMechanical, 4 air changes

Included as standard

  • Structure
  • Insulated wall panels
  • Windows and doors
  • Exterior cladding
  • Delivery to port

Améliorations en option

  • Kitchen and appliances
  • Bathroom fit-out
  • Décoration d'intérieur

Units ship from our own facility. Typical lead time is 6 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.

Typical lead time

Manufacture 6 weeks · freight 3–5 weeks

Can it take a power rack and a treadmill?

Yes. The floor is designed for 5 kN/m², and impact-resistant matting is recommended over the deck.

Will neighbours hear the weights?

The steel frame is acoustically treated, but dropped weights are transmitted through the foundation. Isolating pads help significantly.

Tell us your project.
Nous quote in 24 hours.

Indiquez-nous votre emplacement, votre calendrier et votre configuration. Nous vous enverrons une étude de faisabilité, une estimation de budget et un à trois modèles recommandés.

Réponse sous un jour ouvré NDA on request English · German · French · Spanish

Request a quote — G520