O120 Modular Office Unit
The O120 is a two-module office building for sites where speed matters: an operational yard, a temporary headquarters or a project office alongside construction work.
- Structure: Volumetric steel modules
- Insulation: Mineral wool 120 mm · R-28
- Deploy: 3 days
- Warranty: 10-year structural
- Rating: 4.8 · 19 installs
Choisir une configuration
See the O120 in action
Walkthrough
The O120 is a two-module office building for sites where speed matters: an operational yard, a temporary headquarters or a project office alongside construction work.
Acoustic partitions and an MVHR system are standard, because the most common complaint about modular offices is noise and stuffiness, not appearance.
Foundations are pier-based, so the unit can be relocated when the site use changes, and the structure retains resale value.
| Surface intérieure | 120 m² |
|---|---|
| Ceiling height | 2.7 m |
| Modules | 2 × 60 m² |
| Power | Three phase ready |
| Ventilation | MVHR with cooling coil |
| Acoustic partitions | Rw 45 dB |
Included as standard
- Structure
- Insulated wall panels
- Windows and doors
- Exterior cladding
- Delivery to port
- Kitchen and appliances
- Bathroom fit-out
- Décoration d'intérieur
Units ship from our own facility. Typical lead time is 10 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.
Manufacture 10 weeks · freight 3–5 weeks
Can it be extended later?
Yes, if the foundation and services are sized for the second phase at the outset.
Is it relocatable?
With pier foundations and demountable connections, yes. Relocation cost depends mainly on crane and transport.
Tell us your project.
Nous quote in 24 hours.
Indiquez-nous votre emplacement, votre calendrier et votre configuration. Nous vous enverrons une étude de faisabilité, une estimation de budget et un à trois modèles recommandés.