O150 Site Office and Welfare Block
The O150 is a stacked site accommodation block with offices below and welfare space above, delivered fully fitted.
- Structure: Volumetric modules, stacked pair
- Insulation: Mineral wool 100 mm · R-24
- Deploy: 3 days
- Warranty: 10-year structural
- Rating: 4.7 · 24 installs
Choisir une configuration
See the O150 in action
Assembly in 60 seconds
The O150 is a stacked site accommodation block with offices below and welfare space above, delivered fully fitted.
Canteen, washrooms, drying room and lockers are included, which is usually what a main contractor needs to discharge welfare obligations on a large site.
Because modules are stacked, the footprint on a constrained site is roughly half of an equivalent single-storey arrangement.
| Surface intérieure | 150 m² |
|---|---|
| Modules | 2 stacked |
| Power | Three phase, 100 A |
| Canteen | 40 seats |
| Washrooms | 4 with showers |
| Drying room | 8 hooks, heated |
Included as standard
- Structure
- Insulated wall panels
- Windows and doors
- Exterior cladding
- Delivery to port
- Kitchen and appliances
- Bathroom fit-out
- Décoration d'intérieur
Units ship from our own facility. Typical lead time is 9 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.
Manufacture 9 weeks · freight 3–5 weeks
How long does installation take?
Two days of cranage plus a day of connections for the stacked configuration.
Can the layout be split?
Yes. Office and welfare areas can be supplied as separate modules for phased delivery.
Tell us your project.
Nous quote in 24 hours.
Indiquez-nous votre emplacement, votre calendrier et votre configuration. Nous vous enverrons une étude de faisabilité, une estimation de budget et un à trois modèles recommandés.