Now shipping to 40+ countries · CE & ISO-certified, factory-direct Obtenir un devis en 24 h →
Model V340 · Luxury

V340 Luxury Prefab Villa

5.0 · 5 builds

The V340 is a bespoke hybrid villa for hospitality and high-end residential projects, where the frame is a platform for an architect-led design.

Why this home
  • Structure: Hybrid steel and timber
  • Insulation: PIR 120 mm + mineral wool 160 mm
  • Deploy: 14 days
  • Warranty: 10-year structural
  • Rating: 5.0 · 5 builds
Surface intérieure
340 m²
Chambres
5
Salles de bain
5
Deployment
14 days
Structure
Hybrid steel and timber
Insulation
PIR 120 mm + mineral wool 160 mm

Choisir une configuration

On application Factory-direct · indicative quote within 24h
CE & ISO 9001 10-year structural warranty Livraison mondiale
Watch

See the V340 in action

Velaroom demo visual 12 Assembly in 60 seconds

The V340 is a bespoke hybrid villa for hospitality and high-end residential projects, where the frame is a platform for an architect-led design.

Steel carries the long spans and cantilevers; timber handles the highly insulated envelope and the interior finish.

Every unit is engineered individually and priced against the approved drawing set, so there is no catalogue figure for this model.

V340 Luxury Prefab Villa — Specifications
Surface intérieure340 m²
Floors2 plus roof terrace
GlazingFloor to ceiling, triple
PoolStructural slab prepared
Smart systemsKNX ready
FinishBespoke joinery

Included as standard

  • Structure
  • Insulated wall panels
  • Windows and doors
  • Exterior cladding
  • Delivery to port
  • Kitchen and appliances
  • Bathroom fit-out
  • Décoration d'intérieur

Units ship from our own facility. Typical lead time is 18–20 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.

Typical lead time

Manufacture 18–20 weeks · freight 3–5 weeks

How much design time is required?

Expect twelve to sixteen weeks of design development with your architect before production drawings are frozen.

Can a pool be integrated?

Yes. The pool structure and plant room are designed as part of the foundation package.

Tell us your project.
Nous quote in 24 hours.

Indiquez-nous votre emplacement, votre calendrier et votre configuration. Nous vous enverrons une étude de faisabilité, une estimation de budget et un à trois modèles recommandés.

Réponse sous un jour ouvré NDA on request English · German · French · Spanish

Request a quote — V340