Sixteen pods on a ski resort site with severe winter conditions and a compressed installation window between seasons.

Roof structures were engineered for 3.2 kPa of snow, above the local minimum, and detailed with a steep pitch that sheds snow clear of entrances.

Installation ran in early winter with heated temporary enclosures around connection works, which kept the programme intact without risking the finishes.

Planning a similar site?

Send us your site plan and unit count. We'll return a master-plan concept, a repeatable model and an indicative budget.

Start a similar project →