A 24-unit hillside resort on a sloping site where traditional construction would have required extensive retaining works and a long, disruptive programme.
Screw pile foundations removed the need for excavation on the slope, and the units were craned into position over three weeks in two phases.
Each pod was delivered with its wet room and heat pump installed, which meant the resort could open the first nine units while the remainder were still being commissioned.