Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →
Model G380 · Conversion

G380 Garage Conversion ADU Kit

4.6 · 30+ installs

Converting an existing garage is the cheapest route to a legal second dwelling, because the foundation, roof and often the services already exist.

Why this home
  • Structure: Existing frame + steel infill
  • Insulation: PIR 100 mm internal · R-28
  • Deploy: 10 days
  • Warranty: 10-year structural
  • Rating: 4.6 · 30+ installs
Área interna
38 m²
Bedrooms
1
Bathrooms
1
Deployment
10 days
Structure
Existing frame + steel infill
Insulation
PIR 100 mm internal · R-28

Choose a configuration

From $24,900 Factory-direct · indicative quote within 24h
CE & ISO 9001 10-year structural warranty Ships worldwide
Watch

See the G380 in action

Velaroom demo visual 10 Assembly in 60 seconds

Converting an existing garage is the cheapest route to a legal second dwelling, because the foundation, roof and often the services already exist.

The kit covers the garage door infill, an insulated floor build-up, an independent ceiling frame for acoustics, and a complete internal partition set.

The main risks are ceiling height and floor level relative to the house. Both are checked in a short survey before the kit is cut to size.

G380 Garage Conversion ADU Kit — Specifications
GlazingDuplo, com corte térmico
HeatingElectric panel, upgradeable
Typical area32–42 m²
Garage door openingInfill panel system
Floor build-upInsulated raft 100 mm
CeilingIndependent acoustic frame

Included as standard

  • Estrutura
  • Insulated wall panels
  • Windows and doors
  • Exterior cladding
  • Delivery to port

Melhorias opcionais

  • Kitchen and appliances
  • Bathroom fit-out
  • Interior decoration

Units ship from our own facility. Typical lead time is 5 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.

Typical lead time

Manufacture 5 weeks · freight 3–5 weeks

Will my slab be thick enough?

Most modern garage slabs are. We ask for a core sample or a local assessment before confirming the floor build-up.

Is the garage door removed?

It is replaced by an insulated infill panel with a window and a standard entrance door.

Tell us your project.
Vamos quote in 24 hours.

Informe-nos o local, o prazo e a configuração, e devolveremos uma análise de viabilidade, um orçamento indicativo e um a três modelos recomendados.

Respondemos em até um dia útil NDA on request English · German · French · Spanish

Request a quote — G380