Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →
Model G520 · Gym

G520 Backyard Gym Pod

4.7 · 20+ installs

The G520 takes the S240 shell and adds a reinforced floor, higher ceiling and mechanical ventilation sized for a workout space.

Why this home
  • Structure: Steel frame, reinforced floor
  • Insulation: Mineral wool 100 mm · R-24
  • Deploy: 1 day
  • Warranty: 10-year structural
  • Rating: 4.7 · 20+ installs
Área interna
31 m²
Bathrooms
1
Deployment
1 day
Structure
Steel frame, reinforced floor
Insulation
Mineral wool 100 mm · R-24

Choose a configuration

From $26,400 Factory-direct · indicative quote within 24h
CE & ISO 9001 10-year structural warranty Ships worldwide

The G520 takes the S240 shell and adds a reinforced floor, higher ceiling and mechanical ventilation sized for a workout space.

Ventilation is the specification most people forget. Four air changes per hour keeps humidity and odour under control without opening the door in winter.

It can be supplied with a small shower room, which in practice doubles the number of people who will use it regularly.

G520 Backyard Gym Pod — Specifications
Área interna31 m²
Ceiling height2.9 m
Floor loading5.0 kN/m²
GlazingDouble, obscured to 1.2 m
PowerDedicated 40 A circuit
VentilationMechanical, 4 air changes

Included as standard

  • Estrutura
  • Insulated wall panels
  • Windows and doors
  • Exterior cladding
  • Delivery to port

Melhorias opcionais

  • Kitchen and appliances
  • Bathroom fit-out
  • Interior decoration

Units ship from our own facility. Typical lead time is 6 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.

Typical lead time

Manufacture 6 weeks · freight 3–5 weeks

Can it take a power rack and a treadmill?

Yes. The floor is designed for 5 kN/m², and impact-resistant matting is recommended over the deck.

Will neighbours hear the weights?

The steel frame is acoustically treated, but dropped weights are transmitted through the foundation. Isolating pads help significantly.

Tell us your project.
Vamos quote in 24 hours.

Informe-nos o local, o prazo e a configuração, e devolveremos uma análise de viabilidade, um orçamento indicativo e um a três modelos recomendados.

Respondemos em até um dia útil NDA on request English · German · French · Spanish

Request a quote — G520