P64 Resort Hotel Unit
The P64 is a resort suite delivered as two modules: a sleeping module and a living module with a bathroom in each.
- Structure: Volumetric modules, paired
- Insulation: Mineral wool 150 mm · R-32
- Deploy: 2 days
- Warranty: 10-year structural
- Rating: 4.9 · 40+ installs
Choose a configuration
See the P64 in action
Factory tour
The P64 is a resort suite delivered as two modules: a sleeping module and a living module with a bathroom in each.
Bathrooms are factory fitted, pressure tested and certified, which removes the trades that most often delay a hotel opening.
Modules are designed with common interfaces, so the same unit can be deployed as a standalone suite or combined into a larger block.
| Área interna | 64 m² |
|---|---|
| Modules | 2 |
| Bathroom | Factory fitted and tested |
| Acoustic separation | Rw 57 dB |
| Room count | 1 suite or 2 keys |
| Services | Individually metered |
Included as standard
- Estrutura
- Insulated wall panels
- Windows and doors
- Exterior cladding
- Delivery to port
- Kitchen and appliances
- Bathroom fit-out
- Interior decoration
Units ship from our own facility. Typical lead time is 11 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.
Manufacture 11 weeks · freight 3–5 weeks
Can units be joined into larger blocks?
Yes. Modules are designed with common interfaces so blocks of four, six or more are standard.
How is maintenance handled?
Service access is from the outside face, so rooms stay occupied during routine maintenance.
Modelos relacionados
Tell us your project.
Vamos quote in 24 hours.
Informe-nos o local, o prazo e a configuração, e devolveremos uma análise de viabilidade, um orçamento indicativo e um a três modelos recomendados.