Power

Solar generation in December can be a third of June output at high latitudes. Systems sized on annual averages fail every winter, which is when occupants need them most.

Основные выводы
  • Size for the worst month, not the average.
  • Water storage is usually the binding constraint, not power.
  • Waste treatment needs a maintenance contract, not just a tank.

Plan a backup: a generator, a larger battery or a reduced winter load. Honest designs state which one they rely on.

Water

Storage volume is set by the dry season and the number of occupants, not by the tank that fits under the unit. Rain harvesting needs filtration and first-flush diversion to be usable.

Freeze protection matters in shoulder seasons. A tank that survives winter is usually buried or insulated below the frost line.

Waste

Composting and aerobic systems both need steady use and periodic servicing. A unit occupied two weekends a month behaves very differently from a full-time home.

Check local discharge rules before choosing. Some jurisdictions allow grey water irrigation, others require a certified treatment unit regardless of site size.

Want this applied to your site?

Send us your location, target size and budget range. A project advisor will reply within one business day.

Get a free recommendation →

Built to order
Need something we do not list? We can build it.
Custom layouts, sizes, cladding and full turnkey fit-out.
Describe your project
Томас Берг
Автор

Томас Берг — Structural & Compliance Lead

Инженер-конструктор по образованию, переводчик кода по необходимости. Томас проверяет каждую модель на соответствие требованиям IRC, Eurocode, EN и NCC до запуска в производство.

View profile & all articles →