Structural package

You need sealed structural drawings, a foundation design matched to your soil report, and calculations for snow, wind and seismic loads at your address — not a generic regional figure.

Основные выводы
  • Stamped structural drawings are non-negotiable in almost every market.
  • Thermal calculations decide whether your wall build-up is accepted.
  • Ask for the documents before you sign, not after.

If the supplier cannot stamp for your jurisdiction, budget for a local engineer to review and seal. That review typically takes two to four weeks and is worth scheduling first.

Energy and envelope

Most reviewers want a wall and roof assembly with U-values, plus glazing performance. Manufacturers that publish tested assemblies move through plan check far faster than those supplying one-off letters.

Fire ratings matter on boundary walls. A one-hour assembly is common where the unit sits within three feet of a property line.

Site and services

A site plan showing setbacks, the utility trench route and drainage is required everywhere. Add a geotechnical report if the ground is fill or slope.

Finally, keep the installation manual. Some jurisdictions treat a prefab install as a site-built activity and will inspect the connections, not just the factory output.

Want this applied to your site?

Send us your location, target size and budget range. A project advisor will reply within one business day.

Get a free recommendation →

Built to order
Need something we do not list? We can build it.
Custom layouts, sizes, cladding and full turnkey fit-out.
Describe your project
Elena Marsh
Автор

Elena Marsh — Head of Design

Leads the design studio at Velaroom. Fourteen years detailing modular and volumetric housing for clients in Europe, North America and Australia, with a focus on layouts that survive a forty-foot container.

View profile & all articles →