Now shipping to 40+ countries · CE & ISO-certified, factory-direct Расчёт за 24 ч →
Model A560 · ADU

A560 Two-Bed Detached ADU

4.8 · 35+ installs

The A560 adds a second bedroom and a slightly larger living space, which is usually the difference between accommodation for one person and accommodation for a small household.

Why this home
  • Structure: Steel frame, cold-formed
  • Insulation: Mineral wool 140 mm · R-30
  • Deploy: 2 days
  • Warranty: 10-year structural
  • Rating: 4.8 · 35+ installs
Внутренняя площадь
56 m²
Спальни
2
Ванные комнаты
1
Deployment
2 дня
Structure
Стальной каркас, холодная штамповка
Insulation
Минеральная вата 140 мм · R-30

Выберите конфигурацию

From $54,800 Напрямую с завода · ориентировочное предложение за 24 часа
CE & ISO 9001 10-year structural warranty Доставка по всему миру

The A560 adds a second bedroom and a slightly larger living space, which is usually the difference between accommodation for one person and accommodation for a small household.

Both bedrooms are sized to take a double bed with circulation space on three sides, and the bathroom is accessible from the hallway rather than through a bedroom.

For rental use, the model is often specified with a laundry connection and a storage cupboard by the entrance — small additions that consistently appear in longer tenancies.

A560 Two-Bed Detached ADU — Specifications
Внутренняя площадь56 m²
External size11.0 × 5.2 m
Высота потолка2.7 m
Спальни2 (3.4 × 3.2 m each)
FoundationPier and beam
GlazingTriple, argon-filled

Included as standard

  • Каркас
  • Insulated wall panels
  • Windows and doors
  • Exterior cladding
  • Delivery to port
  • Kitchen and appliances
  • Bathroom fit-out
  • Внутренняя отделка

Units ship from our own facility. Typical lead time is 9 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.

Typical lead time

Manufacture 9 weeks · freight 3–5 weeks

Does a two-bedroom ADU rent better?

In most markets it commands 20 to 30% more than a studio while costing about a third more to build.

Is a second bathroom available?

Yes, as a factory option. It changes the internal layout, so it must be specified before production.

Tell us your project.
Мы quote in 24 hours.

Укажите площадку, сроки и конфигурацию — мы подготовим заключение о возможности реализации, ориентировочный бюджет и от одной до трёх рекомендованных моделей.

Отвечаем в течение рабочего дня NDA on request English · German · French · Spanish

Request a quote — A560