H760 Two-Story Modular Home
Two-storey volumetric construction uses the same module platform stacked around a central stair, doubling the floor area for roughly 60% of the additional cost of a second building.
- Structure: Stacked volumetric modules
- Insulation: Mineral wool 150 mm · R-32
- Deploy: 5 days
- Warranty: 10-year structural
- Rating: 4.8 · 14+ installs
Выберите конфигурацию
Посмотрите, как H760 работает
Walkthrough
Two-storey volumetric construction uses the same module platform stacked around a central stair, doubling the floor area for roughly 60% of the additional cost of a second building.
The lower modules carry the upper ones through engineered corner posts and a continuous load path, verified by calculation rather than assumed.
The footprint advantage is the real benefit: a four-bedroom home can sit on a plot too small for a bungalow of the same area.
| Внутренняя площадь | 152 m² over two levels |
|---|---|
| Высота потолка | 2.7 m |
| Modules | 4 stacked |
| Glazing | Triple, argon-filled |
| Crane | 40 t, one day |
| Structural | Ground floor designed for stacking |
Included as standard
- Каркас
- Insulated wall panels
- Windows and doors
- Exterior cladding
- Delivery to port
- Kitchen and appliances
- Bathroom fit-out
- Внутренняя отделка
Units ship from our own facility. Typical lead time is 12–14 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.
Manufacture 12–14 weeks · freight 3–5 weeks
Does the ground floor need extra structure?
Yes. The lower modules are engineered for the stacked load, which is a design decision made at quotation stage.
Can the stair be repositioned?
Within limits. Moving it changes module boundaries and is priced as a custom option.