A temporary welfare village for 240 workers on a pipeline project, installed in four weeks and designed for recovery at the end of the contract.
Modules sit on timber sleeper pads, which removed any groundwork and left the site in its original condition when the village is removed.
Because the buildings retain their value on recovery, the whole-life cost was materially lower than leasing equivalent accommodation.
Send us your site plan and unit count. We'll return a master-plan concept, a repeatable model and an indicative budget.