The building package
The shell covers structure, insulation, windows, doors and exterior finish. On a 400 to 800 square foot unit this is where the visible quality lives, and it is the part a factory can hold to a fixed price.
- The building itself is usually 45–60% of an installed ADU.
- Site work and utility connections are the least predictable line item.
- Getting the shell off-site is the single largest cost lever you control.
Fit-out — kitchen, bath, flooring, cabinetry — typically adds 25 to 35% on top of the shell if you buy it as a package rather than sourcing locally.
Site work and utilities
Excavation, a trench to the main service, a new electrical panel and a sewer or septic connection can each surprise you. Ask for a site survey before signing anything; the number that matters is the distance from the unit to the existing service entry.
Foundations are commonly a pier-and-beam system for prefab, which is cheaper and faster than a full slab but needs engineering sign-off in frost zones.
Permits, fees and soft costs
Plan check, school fees and utility connection charges are jurisdiction-specific and rarely negotiable. Budget them as a contingency rather than a fixed line.
Design and engineering fees are usually included when you buy from a manufacturer that stamps its own drawings — a real saving versus assembling a local design team.