Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →
Model A560 · ADU

A560 Two-Bed Detached ADU

4.8 · 35+ installs

The A560 adds a second bedroom and a slightly larger living space, which is usually the difference between accommodation for one person and accommodation for a small household.

Why this home
  • Structure: Steel frame, cold-formed
  • Insulation: Mineral wool 140 mm · R-30
  • Deploy: 2 days
  • Warranty: 10-year structural
  • Rating: 4.8 · 35+ installs
Internal area
56 m²
Bedrooms
2
Bathrooms
1
Deployment
2 days
Structure
Steel frame, cold-formed
Insulation
Mineral wool 140 mm · R-30

Choose a configuration

From $54,800 Factory-direct · indicative quote within 24h
CE & ISO 9001 10-year structural warranty Ships worldwide

The A560 adds a second bedroom and a slightly larger living space, which is usually the difference between accommodation for one person and accommodation for a small household.

Both bedrooms are sized to take a double bed with circulation space on three sides, and the bathroom is accessible from the hallway rather than through a bedroom.

For rental use, the model is often specified with a laundry connection and a storage cupboard by the entrance — small additions that consistently appear in longer tenancies.

A560 Two-Bed Detached ADU — Specifications
Internal area56 m²
External size11.0 × 5.2 m
Ceiling height2.7 m
Bedrooms2 (3.4 × 3.2 m each)
FoundationPier and beam
GlazingTriple, argon-filled

Included as standard

  • Structural frame
  • Insulated wall panels
  • Windows and doors
  • Exterior cladding
  • Delivery to port
  • Kitchen and appliances
  • Bathroom fit-out
  • Interior decoration

Units ship from our own facility. Typical lead time is 9 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.

Typical lead time

Manufacture 9 weeks · freight 3–5 weeks

Does a two-bedroom ADU rent better?

In most markets it commands 20 to 30% more than a studio while costing about a third more to build.

Is a second bathroom available?

Yes, as a factory option. It changes the internal layout, so it must be specified before production.

You might also like

Related models

ADU
Model A400
A400 Detached ADU Studio
Area40 m² Beds1 Deploy1 day
ADU
Model A620
A620 Attached ADU Suite
Area62 m² Beds2 Deploy3 days

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — A560