Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

ADU kit with drawings and a bill of materials for your builder

An ADU kit arrives as a numbered package: cut frame, finished panels, bill of materials and drawings for your own crew or a local contractor.

Why this home
  • A numbered schedule and packing list let a local crew build without a specialist on site.
  • Panels arrive cut, insulated and labelled, so site work is assembly rather than carpentry.
  • You set the scope: shell only, or a package that adds glazing, wet zones and linings.
  • Drawings and the bill of materials arrive together, so contractor quotes compare like for like.
  • A fixed kit list makes the order repeatable, which keeps later repairs and extensions simple.

Choose a configuration

From $799 / set Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

An ADU kit arrives as a numbered package: cut frame, finished panels, bill of materials and drawings for your own crew or a local contractor.

A kit frame cut to a numbered schedule

The frame ships as loose members cut to a schedule: posts, rails, beams and cleats stamped with a position number that matches the drawing. Assembly is a matter of matching numbers and torquing fixings, which is why the kit does not need a fabricator standing on site. The frame is container-grade steel, and every joint is identified on the structural schedule.

Panels that close the shell in a set order

Wall, floor and roof panels leave the factory with insulation and lining already built in, so the shell closes in a fixed sequence without wet trades. Each panel keys to its neighbour through a joint detail shown on the layout sheet, and the sequence sheet states which face points outward.

Plans you choose from, not a blank page

The kit is offered as a family of plans rather than a bespoke design, so room sizes, door swings and window positions are already resolved and costed. Choosing a plan early keeps the panel layout, the service routes and the approval drawings consistent with one another.

First-fix drawings for your own trades

Services are left at first fix: conduit, water and waste routes are drawn onto the panel layout, and the kit supplies sleeves and boxes so your trades can pull cable and pipe before the lining closes. Nothing is connected at the factory, because the supply arrangement belongs to your site.

What actually arrives on the truck

Delivery is packed by build stage, so the frame bundle comes off first and the trim last, following the order printed on the sequence sheet. A kit for a small unit fits standard freight, and the packing list is the document the driver and the site manager both sign.

The compliance pack that travels with the kit

The documents travel with the panels: plans, sections, connection details, the structural schedule and the wind basis the frame was checked against. Your local designer adapts foundations and drainage to the site, and the pack supplies the numbers to do that without redrawing the kit.

ADU kit with drawings and a bill of materials for your builder — Specifications
Structurecontainer-grade steel
ColorsCustom colours

Included as standard

  • Prefabricated structural frame
  • Roof and wall panels
  • Doors and glazing
  • Insulation package
  • Fastening system
  • Numbered assembly drawings

Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.

Should the ADU kit be ordered as a shell or fully finished?

It comes down to what your local labour can do and how much work you want exposed to weather. A bare shell is the simplest to ship and leaves finishes for your crew to buy and fit; the insulated stage arrives with walls and roof closed and services roughed in; a finished unit needs only connection and commissioning. Your advisor prices all three against the same drawing set, so the comparison is about labour availability and schedule, not about three different buildings.

How long does it take to assemble an ADU kit?

Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.

What comes in an ADU kit and what is left out?

A shell kit holds frame members, floor, wall and roof panels, connectors, sealant and the fixings needed for the sequence, all cut and labelled against a numbered schedule, with drawings and a bill of materials. Glazing, doors, the bathroom pod, kitchen units, electrical gear and finishes are usually separate lines, because they depend on local supply and on who is doing the work. The scope sheet marks every line as included, optional or excluded, so nothing is assumed at the site gate.

Can I assemble an ADU kit myself?

The envelope is designed for a two- or three-person crew that can read a drawing, lift a panel and work at height safely, which is why panels are sized and numbered instead of cut on site. Most self-builders take the shell themselves and bring in an electrician, a plumber and a roofer for the connections. Services, drainage and the final inspection are the stages that usually need a licensed trade, and the assembly notes say where those sign-offs fall.

What is not covered by the price of an ADU kit?

The crate price covers the kit as specified, export packing and loading at origin. Freight to your port or site, duties and clearance, the prepared base and all local labour are quoted as separate lines, and appliances, tapware and sometimes interior doors are often bought near you. If you would rather have those items included, say so while the quotation is open so the list is closed before production. Your advisor sends the exclusion list with the figures.

Can I still change the ADU kit after the bundles are cut?

Before production the drawing set is yours to adjust, and changes at that stage cost nothing beyond a short delay. Once bundles are cut, a change means re-ordering the affected numbered pieces rather than editing a list, so the practical move is to shift a socket or a window on site and leave frame and panel sizes alone. Say which kind of late change you expect, and your advisor can pack spares and easy-to-trim pieces with the kit.

What is the frame made of?

The structure is container-grade steel, with galvanised connections throughout. Wall and roof panels are insulated, and the floor is engineered for year-round living. Everything arrives pre-drilled and numbered, so the build is guided assembly rather than on-site carpentry.

What foundation does it need?

A concrete slab, strip footings or pier foundations are all suitable, depending on soil and local practice. We supply the connection details for each option, so your local builder can prepare the base while the kit is in production.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — ADU kit with drawings and a bill of materials for your builder