Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

Attached ADU kit with a galvanised steel frame

An attached ADU shares a wall with your house, and its panels, roof junction and services are drawn to meet the building already standing there.

Why this home
  • One wall shared with the house means a smaller footprint, a shorter build and no second driveway.
  • Anchored to your existing wall but carried on its own footings, so old masonry is not overloaded.
  • Power, water and waste are tapped from the house, so there is no new connection to arrange.
  • Panels cut to side-path widths are carried past the fence instead of craned over the roof.
  • The roof junction is detailed to shed water away from both buildings, not into the joint.

Choose a configuration

From $6,800 / set Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

An attached ADU shares a wall with your house, and its panels, roof junction and services are drawn to meet the building already standing there.

A frame that bolts to the wall you already have

The new frame stands on its own footings but is tied back to the house along a line of anchors set into the existing wall, so the addition never leans on old masonry for support. Loads in that shared wall are read from the original drawings or a site survey before the anchor pattern is fixed, because a wall built for a carport rarely carries a second storey. The addition's frame is galvanised steel, carried on its own footings and anchored back to the house at the shared wall.

A roof junction that keeps the weather out

The new roof either steps below the existing eaves or dies into the wall behind a flashed upstand with a cavity tray, and that choice decides how much headroom the rooms get at the junction. Insulation crosses the joint instead of stopping at the wall face, so the coldest line in the new rooms is not the one you already own. Walls and roof carry EPS foam, run continuously into the junction with the existing wall.

Rooms that borrow the house's circulation

Most attached ADUs are entered from the house through a new internal door, which lets the plan spend its area on rooms rather than a corridor and a second entrance. Where a separate front door is required, it goes on the elevation that holds the bedrooms away from the shared wall and from the family's own routes. Floor area is 37 m², measured inside the new walls. The sleeping side is 2 bedrooms, kept away from the door shared with the house.

Services tapped from the main house

Power, water and waste come from the existing house rather than a new connection, so the work is a short run through the shared wall and a sub-panel inside the new rooms. Capacity is checked first: the main board, the incoming water main and the drain invert all have to take the extra load before the tie-in is designed.

Panels sized to pass down a side path

Because the only route in is usually a side gate or the house itself, panels are cut to widths that two people can carry upright past a fence line and turn a corner. Anything too wide for the path is left as a site-cut item or split into two panels joined on the frame, agreed before production rather than discovered on the day. The frame is galvanised steel with lifting points at the panel centres, so a short crane lift stays an option where the path defeats the crew.

Setbacks settled before the drawings are signed

An attached addition is measured from the property line and from the house, and both distances are usually tighter than a detached unit would face, so they are checked against the survey before the plan is frozen. Height, window positions and the roof line are then set to keep overlooking away from neighbouring gardens while still meeting the separation the shared wall needs.

Attached ADU kit with a galvanised steel frame — Specifications
Bedrooms2 bedrooms
Structuregalvanised steel
InsulationEPS foam
Floor area37 m²
ColorsCustom colours
StyleModern

Included as standard

  • Prefabricated structural frame
  • Roof and wall panels
  • Doors and glazing
  • Insulation package
  • Fastening system
  • Numbered assembly drawings

Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.

What separates the unit from the main house in case of fire?

The wall and floor between the two dwellings are drawn as a separating assembly, with a self-closing door at the link and the escape route kept clear. The exact build-up is set by your local building rules rather than by us, which is why the detail goes onto your drawing set. Send your site address with the enquiry and the same junction reaches your authority that your builder will construct.

Can an opening be cut between the attached ADU and the house?

It depends on what the existing wall carries, so an engineer or your builder checks the load path and the older footing before drawings are signed. A load-bearing wall needs a sized lintel and sometimes a new support pad on the house side, while a partition simply opens. The position of the doorway, its header detail and the new leaf are shown on the drawing set you approve, and cutting starts only after that approval.

How do the two roofs meet?

The junction is designed rather than improvised: the unit roofline is drawn to drain into its own gutter or into the existing valley, with a flashed step, a new gutter run and clear outfall away from the wall. Your roofing contractor builds those details from the same drawings, and the seam is one of the items checked before the shell is closed. Tell us whether the house roof is tiled, metal or flat, and the tie-in is chosen for that cover.

Can the attached ADU be closed off from the main house?

Yes: the link is drawn as a doorway with an actual door, so the unit works as a private flat for a relative or a guest and opens through when you want one larger home. Acoustic separation on that wall and independent heating controls are specified at drawing stage, so tell us whether the unit will be occupied at night or used as a daytime extension. Both ways of living are engineered for from the start rather than retrofitted.

How long does it take to assemble an attached ADU?

Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.

What is the frame made of?

The structure is galvanised steel, with galvanised connections throughout. Wall and roof panels are insulated (EPS foam), and the floor is engineered for year-round living. Everything arrives pre-drilled and numbered, so the build is guided assembly rather than on-site carpentry.

What foundation does it need?

A concrete slab, strip footings or pier foundations are all suitable, depending on soil and local practice. We supply the connection details for each option, so your local builder can prepare the base while the kit is in production.

Can the layout be customised?

Yes — window positions, glazing size, the number of bedrooms and the balcony deck are adjusted before production. The kit ships numbered and pre-drilled for the plan you confirm, so late changes are the expensive kind. Finalise the plan with our advisors, then the factory cuts.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — Attached ADU kit with a galvanised steel frame