Camping sanitary unit with private changing space at the door
A camping sanitary unit arrives as a plumbed block with cubicles, shower trays and extract already in place, and is set on a prepared pad so the showers are running before the season opens.
- Tanked wall lining that turns into the floor, so a leak shows at the joint, not in the wall.
- A dry strip at the door where boots come off and the next camper waits.
- Traps and valves behind a removable panel, reachable without breaking a tile.
- Extract above each shower takes steam at the source, so mirrors stay clear.
- Cubicles, trays and pipework travel fitted, which shortens the site programme.
Choose a configuration
A camping sanitary unit arrives as a plumbed block with cubicles, shower trays and extract already in place, and is set on a prepared pad so the showers are running before the season opens.
A shell detailed for water, not only for weather
Walls are lined with a waterproof panel that runs behind the shower fittings and turns into the floor over a sealed upstand, so a leak shows at the joint instead of inside the wall. The roof is a single sheet with the extract penetration sealed in the factory, which is where most campsite leaks begin.
A wet-room layout with a dry strip at the door
Each shower sits in its own bay with a changing space in front and a bench that does not hold water, and the floor falls to a gully inside the bay. The dry strip at the door is where boots come off and the next camper waits, so it is separated by a screen rather than left open to the weather.
Fittings and falls a caretaker can live with
Wastes are short and reachable from a service duct behind the cubicles, and every trap sits under a removable panel rather than under a tiled floor. Taps, shower valves and seats are chosen as bolt-on parts, so a replacement is a spanner job in the morning rather than a tiling job in the afternoon.
Extract at the shower, not at the door
Air enters through a low louvre on the dry side and leaves above each shower, so steam is taken at the source and the mirror does not run. The extract runs through the day and boosts when the lights are on, which keeps the block from smelling of last night by mid-morning.
Craned as a complete block, drained for the road
The unit travels with cubicles, trays and pipework in place, and any loose water is drained before it goes on the lorry. Lifting points are on the frame rather than the roof, and the tank or connection stubs are protected so nobody uses them as a step.
Campers at the front, a service road at the back
The block is placed so campers approach the entrance from the pitch side and a tanker or cleaning van can reach the service side without crossing the queue. A fall away from the doors keeps rain from pooling where people stand, and the drain connection stays on the service side.
| Colors | Custom colours |
|---|
Included as standard
- Structural steel module
- Insulated wall and roof panels
- Doors and windows
- Electrical rough-in
- Interior finish
- Flooring
Typical lead time: production 4–8 weeks, freight 3–6 weeks depending on destination port.
How fast can a camping sanitary unit be up and running?
Most units are placed on prepared footings and connected to power within a few days of delivery. Because the module arrives pre-fitted — walls, wiring, finish and flooring included — site work is limited to foundations and hook-ups. Count on 4–8 weeks of production plus 3–6 weeks of freight to your port, so order with your move-in date in mind.
Can the unit be moved to another site later?
Yes. The module is designed for crane lifting and road transport, so it lifts off its footings and travels whole whenever your project moves. That is the main advantage over a conventional extension, which can only be demolished.
How is privacy built into the layout of a camping sanitary unit?
The plan is worked so nobody is exposed on entering: an anteroom or changing recess between the door and the cubicle line, partitions and door leaves drawn full height, and sight lines from the path checked on the elevation before production. Tell us how campers approach the block — from a pitch row, a footpath or a service road — and the entrance side, the screens and the glazing are arranged around that.
How does a camping sanitary unit keep damp and odour under control?
Ventilation is drawn as a path rather than a hole in the wall: air enters low on the wet side and leaves high through the roof or the end wall, with the shower line and the wc line each under their own extract and door undercuts sized to feed them. Grille sizes, the fall of the duct run and whether a shared shaft is used are specified with your advisor, because shoulder-season damp and full occupancy are two different design cases.
Can a camping sanitary unit be drained down between seasons?
Yes, and the option is drawn at specification rather than improvised in autumn: stopcocks placed where a caretaker can reach them, low points that empty the runs, and an insulated cavity around anything you would rather keep charged if the site stays open. Say whether the block closes for winter or runs unmanned: a shut-down unit is drained, ventilated and cleaned out, while one left in service is heated at a low setting and protected the way your drawings say.
What does a camping sanitary unit take from campers on a busy weekend?
Heavy use is a design input: wall linings that take a hose rather than a scrub, coved floors falling to a gully so mud and grit go down the drain instead of into a joint, and panels, seats and fittings specified as bolt-on parts a caretaker can swap from the spares kept on site. The finish schedule says which items wear out first, so replacement is planned rather than treated as damage.
Where should a camping sanitary unit sit so it can really be serviced?
Two lines matter on the plan: the waste run, which wants a short, graded route to your tank or the mains, and the vehicle line, which wants a tanker or cleaning lorry able to reverse in without crossing the campers’ path. Send us your levels, the pit position and where cleaning kit and consumables will live, and we set the door side and the service side around them, plus a store recess if you want one.
Can the block be extended by adding another unit later?
Yes, provided the first unit is ordered with the extension in mind: the end wall is left as a removable panel, the service connections are grouped on that side, and the roof detail allows a second unit to butt up without a step. The new unit arrives finished and is linked through the shared wall, with the drainage and supply joined in one place. Adding a unit later is straightforward; adding drainage falls later is not, so the levels are set for the final arrangement from the start.
Tell us your project.
We'll quote in 24 hours.
Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.