Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

Folding house with hinged walls and roof that stand up on site

A folding house travels as a stack of hinged panels and becomes a finished building on site: frame, insulation, lining and glazing set in the factory, with only the base, the crane and the connections left to do.

Why this home
  • Panels folded flat at the factory and opened by crane on site.
  • Locking pins and stays that pull the frame square.
  • Compressible gaskets along every hinge line.
  • Kitchen, wardrobes and bathroom pod fitted before the panels fold.
  • Wiring and pipes crossing each hinge in a protected flexible loop.

Choose a configuration

From $998 / set Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

A folding house travels as a stack of hinged panels and becomes a finished building on site: frame, insulation, lining and glazing set in the factory, with only the base, the crane and the connections left to do.

Hinged panels on a frame that locks square

The floor, walls and roof leave the factory as hinged panels around a steel or timber frame, folded flat and braced for the journey. On site the crane lifts the package onto the base and the panels swing out into position, where locking pins and adjustable stays pull the box square before the roof is closed. The frame is light-gauge galvanised steel, with hinged corners and adjustable stays. The structure is calculated for a service life of 30 years.

Seals that close along the fold line

Every hinge carries a compressible gasket, and the panel edges overlap so the seal is squeezed shut when the house opens rather than relying on a bead of mastic. Walls arrive insulated and lined, with the vapour barrier continuous across the joints, so the only site work on the envelope is checking that the gaskets sit flat.

Rooms finished before the panels fold

Kitchens, wardrobes and bathroom pods are fitted in the factory while the panels are still flat on the bench, which is why ceiling height and door swings are settled on the drawing rather than on site. The fold lines are kept to corridor walls and room divisions, so the living space reads as one continuous room once the panels are locked. It is supplied for family homes, villa projects and hotels.

Services that cross the hinge without a joint

Wiring and pipework run through the panels and cross each hinge in a flexible loop, protected by a cover plate that is screwed down after opening. The house terminates at one external connection point for power, water and waste, so the trades on site make final connections in one place instead of chasing cables through finished rooms.

Folded for the road, opened in one lift

The folded package fits the width of a standard flatbed or a container, which keeps the transport simple and the unloading point close to the base. A crane lifts it in one piece, the crew releases the transport braces and the panels unfold in a set sequence, with the roof closed last so the interior stays dry if the weather turns.

A level base, anchors and room to fold again

The base has to be level and compacted before the crane arrives, because a folding house is light and cannot be packed up with timber like a site-built frame. Ground anchors or a chemical fixing into the slab hold the corners down, and the same crane that opened the house can fold it back onto a trailer if it has to move.

Folding house with hinged walls and roof that stand up on site — Specifications
Structurelight-gauge galvanised steel
Design life30 years
StyleModern

Included as standard

  • Prefabricated structural frame
  • Roof and wall panels
  • Doors and glazing
  • Insulation package
  • Fastening system
  • Numbered assembly drawings

Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.

Can a folding house be installed in winter or on frozen ground?

The crane needs a firm, level standing area, and a frozen or waterlogged base is not one, so the platform is prepared and protected before the date. Concrete and chemical fixings have temperature limits, and gaskets and sealant are easier to close correctly above freezing, which may mean temporary heat or waiting for a milder window. Work inside the panels can continue in cold weather once the shell is closed and the connections are live.

What keeps a light folding house down in exposed wind?

The corners are tied to a slab, screw piles or ground anchors, and the load path runs through the frame rather than through the cladding, so the fixing detail matters more than the weight of the building. On an exposed site the anchors are specified for the local wind load and the roof is checked for uplift as well as the walls. A skirt or closed underside also stops wind from getting under the floor and adding to the uplift.

How many people and how much equipment does unfolding a folding house take?

One mobile crane or telehandler does the heavy work: it lifts each hinged wall and the roof section to vertical while a few hands on the ground guide the panels into their stops. The crew then pins the panels, confirms the base is still square and closes the seams, following the fitting guide that travels with the unit. Your quote states which lifting gear the configuration expects, so the crane is booked against a plan rather than a guess.

Can a folding house be folded down and moved again?

Yes — the same hinge system that lets it stand up brings it back down to its shipping profile, and the lifting points used to raise it lower it again. Reusable block or platform footings make that cycle simple, because nothing has to be broken out to release the unit. Say at quotation how often you expect to move: the fold hardware and the gaskets are then specified for repeated duty rather than for a single set-up.

How long does it take to assemble a folding house?

Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.

What should the site have ready for the day a folding house arrives?

Firm, level ground beside the base for the crane and clear headroom for the roof section to swing up, so gates, overhead lines, root runs and tree cover are checked before the delivery date is fixed. The base itself only has to be level and able to carry the load evenly, with any anchor or pad detail drawn for your site and confirmed before production. Your advisor sends the working-space requirement for the lifting gear, so the pitch is prepared rather than improvised.

How much floor space do the folded walls take up once the house is open?

The panels stack at the perimeter, so the clear area is smaller than the outside footprint by the thickness of the folded wall build-up and the corner posts. The drawing should give internal room dimensions rather than only the external size, and those are the numbers to compare with a caravan or a garden room. If a specific sofa or bed has to fit, check the clear width between finished faces, not the panel module.

Do the electrics and plumbing have to be reconnected on site?

The house is wired and piped in the factory up to a terminal and a single external connection point, and the flexible loops at each hinge are already made off and covered. On site an electrician connects the supply and tests the circuits, and a plumber links water, waste and any hot water source at the same point. Nothing is chased into a finished wall, which is why the connection detail is agreed before dispatch.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — Folding house with hinged walls and roof that stand up on site