Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →
Model H480 · Modular Home

H480 Single-Story Modular Home

4.9 · 26+ installs

The H480 is a three-bedroom family home delivered as two volumetric modules, complete with kitchen, bathrooms, flooring and decoration.

Why this home
  • Structure: Volumetric steel modules
  • Insulation: Mineral wool 150 mm · R-32
  • Deploy: 3 days
  • Warranty: 10-year structural
  • Rating: 4.9 · 26+ installs
Internal area
96 m²
Bedrooms
3
Bathrooms
2
Deployment
3 days
Structure
Volumetric steel modules
Insulation
Mineral wool 150 mm · R-32

Choose a configuration

From $118,000 Factory-direct · indicative quote within 24h
CE & ISO 9001 10-year structural warranty Ships worldwide
Watch

See the H480 in action

Velaroom demo visual 14 Assembly in 60 seconds

The H480 is a three-bedroom family home delivered as two volumetric modules, complete with kitchen, bathrooms, flooring and decoration.

Site work is limited to foundations, service connections and final commissioning, which typically takes one to two weeks after delivery.

The unit is designed for a 90-day design-to-installation cycle when drawings are not modified after approval, and that schedule is the main reason buyers choose it.

H480 Single-Story Modular Home — Specifications
Internal area96 m²
Ceiling height2.7 m
Modules2 × 48 m²
Bedrooms3 (master with en-suite)
FoundationPier or raft
GlazingTriple, tilt and turn

Included as standard

  • Structural frame
  • Insulated wall panels
  • Windows and doors
  • Exterior cladding
  • Delivery to port
  • Kitchen and appliances
  • Bathroom fit-out
  • Interior decoration

Units ship from our own facility. Typical lead time is 10–12 weeks for manufacture, followed by three to five weeks of ocean freight to the destination port. Cranage, foundations and local connections are arranged on site; we supply the lifting plan and the connection drawings with the shipping documents.

Typical lead time

Manufacture 10–12 weeks · freight 3–5 weeks

Is it certified as a building before delivery?

The modules are certified as complete units, which simplifies local approval in most markets.

How much site work remains?

Foundations, utility connections, external works and any decking or landscaping not included in the package.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — H480