Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

Resort unit delivered in phases so your site opens sooner

A resort unit built as a repeatable room: shell, bathroom pod and service wall arrive as one specified kit, so the twentieth bungalow matches the first and housekeeping learns the layout once.

Why this home
  • One room type repeated across the site, with the same pod, wall positions and switch heights in every unit.
  • A bathroom pod that arrives finished, instead of a wet room tiled on site in the middle of the season.
  • The service wall gathers hot water, waste and the distribution board, so the trench from the site loop stays short.
  • Bed and bathroom set on the corridor side, leaving the glazed façade and the view to the guest.
  • Batches can be produced in phases, so the first rooms open while later ones are still on the line.

Choose a configuration

From $1,800 / piece Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

A resort unit built as a repeatable room: shell, bathroom pod and service wall arrive as one specified kit, so the twentieth bungalow matches the first and housekeeping learns the layout once.

A shell drawn as a repeatable room

The shell is a steel frame carrying wall and roof panels, so every unit on the site shares one grid, one set of openings and one set of lifting points. Because the room is a drawn type rather than a one-off building, the second batch is cut from the same drawings as the first.

Quiet walls and a steady temperature

Walls and roof carry an insulated core, which keeps a west-facing room from turning into an oven by late afternoon and takes load off whatever cools it. The same build-up is where most of the sound is stopped, both from the terrace and from the room next door.

The room works around the bathroom pod

The plan sets a bathroom pod on the service wall, a wardrobe and luggage wall beside the entrance, and the bed against the corridor side, which leaves the glazed façade to the guest. The pod arrives whole and lands on its own base, so the wet room is a tested product instead of tiling done in a field.

Services meet in one wall, cleaning in one round

Hot water, drainage, ventilation and the room board meet in the wall behind the pod, so the trench from the site loop is short and the access panel stays reachable from the corridor. Switches, sockets and the thermostat sit at the same height in every room, which is the difference between a quick clean and a slow one.

Set down in batches while the property trades

Units travel on a standard trailer and are craned onto prepared pads, so a batch can be landed in the low season without closing a guest road for weeks. Production runs in phases, and the bases, drainage and service tails for the later phases are built during the first works, before the first guest arrives.

Placed for privacy and for the service round

The site plan turns the bed head and the bathroom away from the neighbouring unit, keeps the glazed side on the view and leaves a gap wide enough for a linen trolley and a guest walking back after dark. Plant, the linen store and maintenance access sit off the guest path, where a van can reach them without crossing a terrace.

Resort unit delivered in phases so your site opens sooner — Specifications
DoorsSteel door
WindowsAluminium window
StyleTraditional
Best forHouses, Offices, Hotels, Shops

Included as standard

  • Prefabricated structural frame
  • Roof and wall panels
  • Doors and glazing
  • Insulation package
  • Fastening system
  • Numbered assembly drawings

Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.

How are services planned when several units stand on one site?

The site plan does the work: each unit is placed so its waste falls to the inspection points by gravity without pumping, the hot water distribution is looped so guests are not waiting at the tap, and plant sits away from bedroom windows with its own access for servicing. Individual metering, irrigation and pool equipment are separate runs agreed with your engineer. Your advisor supplies the load and layout information that design needs.

Is a bathroom pod better than a tiled wet room in a resort unit?

A pod is a finished product with its own floor, walls and tray, landed on the base and connected at one face, so the wet room is closed and testable before the room around it is finished. A tiled room puts several trades inside a small space on a site where they compete with landscapers and with guests. The pod also makes the twentieth bathroom identical to the first, which matters when a leak has to be traced from a maintenance manual rather than from memory.

How do you shut a unit down for the closed season?

The routine is isolation and inspection: water off and the system drained or left on a frost setting, filters cleaned, the pod trap primed or sealed, shutters closed and roof outlets cleared. Door and window seals are checked before the season starts, and any touch-up on the frame is done while the room is empty. A short written list per unit keeps the reopening week calm.

How long does it take to assemble a resort unit?

Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.

How do you keep a west-facing room cool before the air conditioning goes on?

Start with the roof and the glass, because that is where the heat arrives: an insulated roof build-up, a ventilated gap above the lining and glazing chosen for the orientation do more than a larger cooling unit. An external shutter or a deep overhang stops the low afternoon sun before it reaches the glass. The unit that cools the room is then sized for the remaining load instead of fighting the façade.

What foundation does it need?

A concrete slab, strip footings or pier foundations are all suitable, depending on soil and local practice. We supply the connection details for each option, so your local builder can prepare the base while the kit is in production.

Where does linen and housekeeping equipment live when every unit is a separate bungalow?

The layout can reserve a bay for linen and a charging point for trolleys beside the entrance, and the site plan groups those bays so one round does not cross the whole property. On larger sites a small store per cluster carries the daily par while the main store stays at the service yard. Tell your advisor how many rooms one attendant covers, and the bay depth is set on the drawings.

Can the layout be customised?

Yes — window positions, glazing size, the number of bedrooms and the balcony deck are adjusted before production. The kit ships numbered and pre-drilled for the plan you confirm, so late changes are the expensive kind. Finalise the plan with our advisors, then the factory cuts.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — Resort unit delivered in phases so your site opens sooner