Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

House frame kit with bundles numbered to the wall lines

A cold-formed steel frame kit for houses: every stud, joist and lintel is cut, punched and marked to the project drawings, bundled by wall, and delivered with the screws, straps and bracing needed to put it up.

Why this home
  • Calculated for winds up to 121+ km/h.
  • Sections sized per member, so no wall carries more steel than it needs.
  • Service holes and screw positions already punched at the works.
  • Boxed lintels that keep the depth down over wide openings.
  • Bracing and hold-downs shown on the erection drawing, not left to site.

Choose a configuration

From $15.2 / m² Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

A cold-formed steel frame kit for houses: every stud, joist and lintel is cut, punched and marked to the project drawings, bundled by wall, and delivered with the screws, straps and bracing needed to put it up.

Gauge and section chosen member by member

A kit is not one profile repeated everywhere: wall studs, floor joists, rafters and lintels each take a section and a steel thickness suited to what they carry, and the schedule lists them wall by wall. Lintels over wide openings are usually boxed sections screwed together on site, which keeps the depth down without a hot-rolled beam. The kit is galvanised steel, scheduled wall by wall. It is calculated for a service life of 50 years.

Roll-formed, punched and bundled in the works

Profiles come off the roll-former cut to length, with service holes, dimples and screw positions already in them, so the assembler works to the marks instead of measuring again. Connections use self-drilling screws at pre-set positions and galvanised straps or angle brackets where a joint has to take tension.

Spans and bracing settled before cutting

The kit is engineered as a whole: joist spans, header sizes and the bracing layout are calculated for the wind and floor loads of that project, and the bracing is shown on the erection drawing rather than improvised on site. Hold-downs at the corners and at the ends of braced walls carry uplift down into the foundation. The frame is calculated for winds up to 121+ km/h.

Coating, cut edges and touch-up

The steel is supplied galvanised, and the coating class is chosen for the exposure the house will see, with a heavier coating where the frame stands in a coastal or industrial setting. Every cut end and drilled hole made on site is touched up with a zinc-rich repair, because that is where rust starts first.

Flat-packed bundles in erection sequence

Bundles are packed one per wall or per floor zone, labelled to match the drawing, and loaded in the reverse order of erection so the first wall is the first bundle off the lorry. The frame is light enough for two people to handle a panel and a small telehandler to lift it on an ordinary plot.

Standard frames, layouts drawn to order

The framing system is standard and the layout is not: any plan that can be drawn in the software can be cut, including extensions, rooms over garages and new floors inside an existing shell. That flexibility suits a builder running several house types from one supplier rather than a single catalogue model. It is built for garage conversions.

House frame kit with bundles numbered to the wall lines — Specifications
Structuregalvanised steel
Wind rating121+ km/h
Design life50 years

Included as standard

  • Panels cut to length
  • Fixing screws
  • Starting and corner trims
  • Installation guide
  • Finish sample card
  • Protective packaging

Typical lead time: production 2–5 weeks, freight 3–6 weeks depending on destination port.

How should the bundles of a house frame kit be stored on site?

Keep bundles off the ground on bearers, under cover or under a sheet that lets air move, and open them only when the wall line they belong to is being erected. Panels stored flat for weeks can take a set, and fixings that sit in puddles corrode before they are used. Plan the delivery to match the erection sequence so the kit is not standing in the weather longer than it must.

What arrives in a house frame kit, and what must I buy locally?

The kit carries the frame members, the wall and roof panels, the connectors and the fixings that join them, packed by element. Foundation work, insulation upgrades, services, internal linings and the final cladding finish are supplied by your local trades, because they follow the building rules where you build. Our advisor issues the bill of materials with the drawings so you can price the local scope before you order.

How is a house frame kit set out and squared on site?

Setting out starts from the slab or the pier grid: the kit includes a setting-out plan tied to the wall lines, and the first frame goes up against a string line rather than by eye. Diagonals are checked before the panels are fixed, because a frame that is out of square will not accept the roof. Your crew works to the tolerances on the drawings, and the local engineer confirms them for your foundation.

Can a house frame kit be closed in by local trades?

Yes: the frame and panels are the part we supply, and everything after that follows local practice such as cladding, external finishes, insulation upgrades, wiring, plumbing and internal linings. Many buyers keep the kit as the structural shell and let their own builder complete the house to the local standard. Tell us at quotation stage which trades you plan to use, so the drawings show the interfaces they need.

Which documents come with a house frame kit for my engineer?

The kit ships with dimension drawings, a bill of materials keyed to the bundle numbers, connection details and the specification sheet for the panels. Your structural engineer uses them to check the frame against local loads and to confirm the fixings into your base. We supply the documents; the sign-off for your site comes from your own engineer and local authority.

What has to be ready before the frame of a house frame kit lands?

The base must be level, cured and at the height shown on the drawings, with any damp course and holding-down positions in place. Access for the delivery vehicle and room to lay out bundles matter as much as the slab itself. Send photographs of the base to our advisor before the delivery date, and the supplier can confirm whether the kit can be released or whether something must be corrected first.

Is this the same as SIP panels?

No — structural insulated panels (SIP panels) are thick OSB-faced blocks that carry floor and roof loads. These are cladding panels: whatever the thickness, they fix to battens or a substructure and the load stays in the frame behind them.

Where can insulated sandwich panels be used?

As wall and ceiling cladding: interior feature walls, shop and office fit-outs, and lining on prefab or container buildings. The surface wipes clean, so kitchens, bathrooms and retail back-of-house are the classic applications.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — House frame kit with bundles numbered to the wall lines