Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

Garage conversion unit that reuses your garage slab and walls

A garage conversion unit turns the box beside your house into a self-contained home, keeping the shell and rebuilding floor, walls and opening.

Why this home
  • The existing garage shell does the work of outside walls, so the build starts at floor level.
  • The wide opening turns into a glazed wall that lights the whole living space.
  • A raised insulated floor copes with a slab that has settled or never had a membrane.
  • Panels and lining pass through the old opening, so no crane and no scaffolding on the drive.
  • Head height is measured under the existing beams before a bedroom is committed to that zone.

Choose a configuration

From $799 / set Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

A garage conversion unit turns the box beside your house into a self-contained home, keeping the shell and rebuilding floor, walls and opening.

Reading the slab before anything is ordered

Garage slabs were poured to carry a car rather than a dwelling, so thickness, level and damp-proofing are checked before a new floor and an inner frame go over them. Where the slab has settled or was laid without a membrane, an insulated raft is laid on top and the frame is set to that higher datum.

Insulation for walls that never had any

A garage is normally a single skin of block under a felt or tiled roof, cold in winter and wet with condensation once somebody cooks and showers inside. The upgrade lines the inner face with insulation, adds a ventilated cavity behind the new board and builds the roof warm, leaving the original walls outside as the weather skin.

The garage door becomes the window wall

The wide opening is the brightest wall in the building, so the kitchen and living space are set against it, with full-height glazing and a solid insulated panel where a car used to drive in. Head height is measured under the existing beams first, because that figure decides whether the bedroom sits beside the living space or in a raised section at the back.

Power and waste dragged across the driveway

Water, waste and power usually have to cross the driveway to reach a garage, so the trench route is agreed with the existing inspection chamber and meter position in view before anything is opened. The unit takes its supply either from the house through that trench or from a new connection at the front boundary, with its own consumer unit and cylinder inside.

Everything goes in through the old opening

The old garage door comes out first and becomes the loading bay: panels, lining and the bathroom pod are cut to widths that pass the opening, so the build needs no crane and no scaffolding over the drive. Deliveries are timed against the trench, because a lorry cannot park where the new supply is waiting to be laid.

Driveway access and the last metre to the door

A converted garage keeps its address on the drive, so the last metre matters: the threshold, the step down to the parking bay and the line a pram or wheelchair takes from the car are all drawn. Drainage across the apron is checked at the same time, because a conversion sitting below road level needs a channel and a raised threshold.

Garage conversion unit that reuses your garage slab and walls — Specifications
Thickness optionsStandard or reinforced
Best forOffices, Warehouses, Factories, Supermarkets

Included as standard

  • Prefabricated structural frame
  • Roof and wall panels
  • Doors and glazing
  • Insulation package
  • Fastening system
  • Numbered assembly drawings

Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.

Can a garage conversion be reversed later?

Yes, in most cases. Because the shell, roof and opening are kept, the conversion is largely a lining, a floor and a glazed infill, and those can come out again if the space is needed for a car. The harder parts to undo are the new drain run across the driveway and any services moved inside the house. Keeping the original opening dimensions on the drawings makes a later reversal much simpler.

How does drainage reach the main sewer from a garage conversion?

Waste leaves through a new drain run to the existing inspection chamber, which is normally the lowest point available and already connects to the sewer. The run is kept as short and as straight as the drive allows, with rodding eyes at each bend, and the trench is shared with the water and power ducts. If the chamber is too shallow for gravity, a small lifting pump is fitted instead.

Who can live in a garage conversion, and can it be rented out?

A junior unit of this kind normally stays tied to the main house: it houses family or is let as an accessory dwelling, and many areas condition any rental on the owner living on the property and on registering the unit. Occupancy length, tenancy rules and parking requirements are set locally, so confirm them with your authority before the layout is fixed. Our advisor supplies the drawings and specification sheet your local office asks for.

How long does it take to assemble a garage conversion unit?

Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.

How much head height do we lose when insulating a garage?

Insulation, a service zone and a ceiling lining together take a useful slice of height, which is why the build-up is drawn before the plan is fixed. A warm roof over the existing structure usually costs less height than insulating between rafters, and a slim floor build-up over the slab protects the ceiling line. If the result is tight, the bedroom moves to the taller end of the garage instead of the whole unit being raised.

How is the old slab prepared for a conversion?

The slab is cleaned back, checked for level and tested for damp before anything is laid on it. Where a membrane is missing, a liquid damp-proof layer goes down first, then insulation and either a floating floor or a thin screed. Hollow spots are broken out and filled, and the new floor is set to a datum that leaves a sensible step at the entrance. Doing this before the frame arrives avoids reworking door heights later.

What happens to the garage door opening?

The opening is normally kept and filled rather than bricked up solid, because it is the best source of light in the building. A new frame spans the existing lintel and carries full-height glazing, with an insulated panel where privacy or a kitchen run is needed. The lintel is checked first: garage openings were sized for a door, not for a heavy glazed screen, so any new load has to be carried down to the slab.

Can I keep parking or a workshop next to the new unit?

Yes — the floor plan can split the garage between a habitable part and a working or parking bay behind a separating wall with its own door. Tell your advisor how the space should be divided and the drawings place the partition, the entrance and the window openings accordingly. The split is confirmed before production, so the frame is built for that layout from the start.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — Garage conversion unit that reuses your garage slab and walls