Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

Log cabin 100 m² with 2 bedrooms

A log cabin delivered with every piece marked: the logs are machined and numbered in the yard, the openings are cut before dispatch, and the work on site comes down to stacking in order on a base that has already been levelled.

Why this home
  • Openings cut at the factory, so site work is stacking in order.
  • Services in trunking or a service wall, never chased into a log.
  • A raised plinth and deep overhangs that keep splash off the bottom course.
  • Loft space under the roof used for sleeping or for storage.
  • Every log marked with its wall and course before it leaves the yard.

Choose a configuration

From $40,000 / set Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

A log cabin delivered with every piece marked: the logs are machined and numbered in the yard, the openings are cut before dispatch, and the work on site comes down to stacking in order on a base that has already been levelled.

Round logs, square logs, and the corner joint

The wall is built from logs machined to a profile, either round with a full face or cut square, and each course locks into the next at the corner through a notch shaped to that profile. The profile decides how the wall moves as it dries, which is why it is settled before the first log is turned.

Built to settle without opening a gap

Fresh logs give up moisture and the wall loses height, so the build-up allows for that movement: threaded rods, fixings with slotted holes at the openings and a reserve above the window heads that closes over the first seasons. Gaskets and seals work inside the joint between logs instead of being asked to hold the movement back.

A ground floor in the round, a loft above

The plan usually keeps the main space as one room around the stove, with bedrooms on the ground floor and a loft under the roof for sleeping or storage. The stair is set against a wall that does not move, so the flight is never hung on a log face that is still coming down. The floor area is 100 m². The plan provides 2 bedrooms. It is built for family homes, villa projects and resort stays.

Services routed outside the log face

Cables and pipes run in surface trunking, in a service wall or inside the floor zone, because chasing a log removes the section that carries the load and cannot be made good once the wall has come down. Boxes are cut at the factory into a batten on the inner face, with the cable entry slotted so the wall can keep settling.

Logs numbered by wall and by course

Each log arrives marked with its wall and its course, and the openings come already cut, so the site work is stacking rather than measuring and sawing. Bundles travel wrapped and are stored clear of the ground, because a log that drinks water on site will move further once the house is closed.

Roof overhang, plinth and ground drainage

A log wall lasts longer under a deep overhang, on a plinth that lifts the bottom course above splash, and with the ground falling away from the base on every side. Pitch and overhang are set against the snow and rain the plot gets, not copied from a catalogue sheet.

Log cabin 100 m² with 2 bedrooms — Specifications
Bedrooms2 bedrooms
Floor area100 m²
ColorsCustom colours

Included as standard

  • Prefabricated structural frame
  • Roof and wall panels
  • Doors and glazing
  • Insulation package
  • Fastening system
  • Numbered assembly drawings

Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.

Is the warmth of a log cabin from the mass of the logs or from insulation?

Both, and they work differently: a thick log wall stores heat and buffers the rooms through the day, but on its own it insulates less than a framed wall with a full cavity. Cabins for cold sites are therefore specified as logs plus a build-up — an inner frame with insulation and lining, or a laminated wall with an insulating core — with glazing and heating matched to that wall. Which route your cabin takes is a drawing decision made against the winter you describe, not a catalogue default.

How long does it take to assemble a log cabin?

Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.

What foundation suits a log cabin, and how is the first course fixed?

Screw piles or a strip footing with a ventilated crawl space are the usual choices, and both need a level bearing surface to within a millimetre or so, because logs are stacked and not adjusted as you go. The bottom log is bedded on a damp course and tied down with threaded rods anchored into the base, so uplift from wind passes through the rod rather than through the weight of the wall alone. Your engineer sizes those anchors against the wind load at the site.

Can a log cabin be extended or moved later?

An extension works if it is planned as a separate volume with its own settlement and a movement joint where it meets the old wall, rather than bonded into the existing courses. Moving is realistic for a small cabin built in numbered courses, provided the roof and the openings are taken down in reverse order and the logs are re-marked. Once a wall has settled, some logs will not go back exactly as they came apart, so treat a move as a rebuild.

How are the logs dried, and how should they be kept before assembly?

Logs and laminated wall elements come out of kiln drying at a moisture level suited to the climate they are shipped to, and travel in numbered bundles together with the roof, the joinery and the fixings list. On site the bundles want covering and raising off the ground from the day they are opened: the one mistake worth avoiding is letting a wall stand in the rain before the roof follows. Because the roof closes quickly behind the wall courses, the crew is planned so that exposed stage stays short, and your advisor can confirm the sequence set out in the fitting guide.

Which corner notch should I choose, and how is the corner kept airtight?

The notch is chosen with the profile and the climate: a saddle notch sheds water well on round logs, while a dovetail or a splined square joint locks the corner harder against wind. Either way the corner needs a gasket or a backer rod inside the joint and a close fit at the outer face, because that is where driving rain finds its way in. Ask to see a sample corner off the same machining line, not just a drawing.

Does the timber move with the seasons, and are surface cracks a problem?

Logs swell and shrink across the year as humidity changes, and fine checks along the grain appear in nearly every log wall; they belong to the wood, do not run through it, and leave the structure untouched. What decides how they look and behave is dryness: a wall shaded by an overhang and standing clear of a splash zone moves far less than a wall that drinks rain. Slight checks are also what a finish coat grips, so a lightly checked wall is not a failing one — a wall that stays wet is.

What does looking after a log facade really involve?

Mostly the coating, not the log: wash the wall, keep an eye on the shaded side where moisture lingers, and renew the finish when water stops beading rather than on a fixed calendar. The foot of the wall, the sill returns and the corner junctions are the places to inspect first, because that is where water spends longest. Your advisor tells you which coating system the specification was written for, since mixing products is the usual reason a facade discolours.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — Log cabin 100 m² with 2 bedrooms