Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

Mobile home 13 m² with 4 bedrooms

A home built as one unit on its own chassis, delivered complete on a low-loader and set on piers: rooms in a straight run, services grouped at one corner and a skirt that closes the underside.

Why this home
  • Delivered as one finished home, craned onto piers without opening a wall.
  • A welded chassis with lifting points at the corners.
  • Floor, walls and roof insulated as one continuous build-up.
  • Bathroom and kitchen back to back, so the wet runs stay short.
  • Power, water, waste and gas arriving at one labelled corner.

Choose a configuration

From $865 / set Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

A home built as one unit on its own chassis, delivered complete on a low-loader and set on piers: rooms in a straight run, services grouped at one corner and a skirt that closes the underside.

A steel chassis under a framed box

The floor frame is a welded chassis with lifting points at the corners, so the whole home is craned or rolled onto its piers in one operation rather than assembled from panels. Above it, studs carry the walls and roof, which is what allows a pitched roof and a full-height ceiling under the same load.

Built for a park winter, not a summer cabin

Insulation runs through the floor, walls and roof as one continuous build-up, and the underside is closed against wind so the floor does not sit over a cold void. Windows are specified with the heating in mind, because a single-glazed unit loses heat faster than the walls ever will.

Rooms in a straight run, wet core in the middle

Bedrooms sit at one end and the living space at the other, with the bathroom and the kitchen back to back so the pipe runs stay short. The corridor is wide enough for a washing machine to pass, and a second door at the far end saves carrying shopping through the living room. Floor area is 13 m². The sleeping end holds 4 bedrooms. Units are used for family homes, garage conversions and offices.

One service corner, one set of connections

Power, water, waste and often gas arrive at a single corner, where the consumer unit, the water heater and the boiler sit close together and the pipe runs stay inside the heated envelope. The inlets are labelled and set at the heights the park or the utility expects, which turns connection day into an hour of work.

One load, one lift, one day on site

The completed home travels on a low-loader, with an escort where the width demands it, and is lifted or rolled onto prepared piers without opening a single wall. The route survey comes first: gate widths, overhead cables, turning circles and the last stretch into the pitch decide whether the delivery date holds.

Piers, a skirt and a wind strap

The home rests on piers set to the chassis bearer positions, strapped down at the corners, and closed underneath with a ventilated skirt that keeps the wind out without sealing moisture in. Steps and a deck are fixed after the unit is level, never before, because a home that settles will pull a fixed stair away from the door.

Mobile home 13 m² with 4 bedrooms — Specifications
External size5,800 × 2,480 × 2,896 mm
Bedrooms4 bedrooms
Floor area13 m²

Included as standard

  • Prefabricated structural frame
  • Roof and wall panels
  • Doors and glazing
  • Insulation package
  • Fastening system
  • Numbered assembly drawings

Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.

How long does it take to assemble a mobile home?

Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.

Can the mobile home be moved after installation?

Yes — the chassis, coupling and lifting points are part of the structure, so the unit travels whole on a standard low-loader whenever the site changes. Footings are re-usable blocks rather than poured work, which keeps a move to one day of crane time.

What utilities does the mobile home connect to?

Water, waste and electrical supplies connect at prepared points along the service wall; specify your local voltage and plug type at order and the wiring arrives matched. Heating and hot water options are chosen the same way, so on-site work is connection only.

Is the mobile home suitable for cold winters?

The build-up is specified per destination: insulation thickness, glazing and heating are sized for the lowest temperatures you report. Residents in mountain and northern sites order the winter package and confirm comfort is maintained without over-running the heating.

How long is the delivery time for a mobile home?

Production takes weeks, not months, because the unit is built on a flowing line; sea freight adds the longest leg on intercontinental orders. Your advisor confirms the exact production window and shipping schedule in the quotation, so delivery is planned, not estimated.

What maintenance does the mobile home need?

Routine care is what any home needs: clean gutters, check sealants annually and service the heating on schedule. The envelope itself is designed to be washed rather than painted, and the chassis and couplings only need a check after each move.

How is a mobile home transported, and what does the route need?

The home travels as a wide load, so the route is surveyed before the date is fixed: bridge heights, overhead cables, narrow bends, roadworks and the final approach all have to fit the convoy. Permits and an escort are arranged by the transporter for the days and hours the authority allows, and a notice period is often required. Send the delivery address and photographs of the last stretch, and the access plan is written before production ends.

Can the roof be changed to a pitched one, and does that affect transport?

A shallow roof is usual on a mobile home because it keeps the travelling height down; a pitched roof is added on site over the top, with the rafters tied into the wall heads. That changes the wind load and the appearance, and some parks have a view on the roof profile before they accept the unit. Decide it with the park and the drawings together, because a roof added later is effectively a different building.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — Mobile home 13 m² with 4 bedrooms