Multi-container home with the upper tier borne by corner posts
A multi-container home assembled from stacked and linked modules: corner-post loads, covered joints and a transport sequence settled before the steel is cut.
- The whole stack reads as one facade, with colour and glazing set across the group.
- A second phase can be added later, with an open end frame left ready for the next module.
- A stair core and a supplied deck turn two tiers into one home, not two boxes.
- Transfer frames are drawn for terraces and corridors, so nothing is packed up on site.
- Service runs gather where modules meet, keeping pipes short and panels reachable.
Choose a configuration
A multi-container home assembled from stacked and linked modules: corner-post loads, covered joints and a transport sequence settled before the steel is cut.
Corner posts do the carrying, not the walls
Each module is built to bear through its four corner posts, so a module above lands on those points rather than along the wall line of the one below. The modules are galvanised steel, with lifting points at the corner castings. They are detailed for a design life of 20 years.
Two tiers, one stair core, a shared terrace
The plan sets how high the stack goes and where the stair sits, because movement between tiers is the part that cannot be improvised once the boxes are on the ground.
A seam that sheds water instead of trapping it
Where two boxes meet, the joint is built as a link: a lined channel in the roof valley, an upstand at every door in the seam, and a movement allowance so the lap can open without tearing the seal.
Pins, plates and a frame for what spans the gap
Upper modules are held square to the ones below by pins or bolted plates sized for wind and crane handling, and the setting-out drawing fixes where every one of them goes.
Loaded in sequence, landed in the same order
Modules are numbered for the ship, the truck and the crane, and the loading plan follows the order they will be set down, so nothing is handled twice on arrival.
Units arranged around a yard that works
Facing rows make a sheltered courtyard, and the same shape funnels wind along the gap, so arrangement, screens and walking routes are decided in one move.
| Structure | galvanised steel |
|---|---|
| Design life | 20 years |
Included as standard
- Structural steel base frame
- Insulated wall and roof panels
- Doors and windows
- Electrical fit-out
- Bathroom pod (fitted options)
- Flooring
Typical lead time: production 4–8 weeks, freight 3–6 weeks depending on destination port.
Can a multi-container home grow after its first phase is occupied?
It is one of the better arguments for a joined layout, provided growth is drawn rather than bolted on later. Leaving room means an open end frame ready to receive the next module, an unused isolation point on each service run, and the link foundation poured while the ground is open. Say which way the second phase goes and your advisor marks the extension line, the craning route and the spare distribution position on the layout you approve; the site engineer confirms access for delivery day.
What should the engineer settle before the pads for a multi-container home are poured?
A cluster puts load at many separate points, and ground seldom behaves the same way at each one. The setting-out drawing lists where every pad sits, and the corner loads go to the engineer, who chooses the remedy — pads, ground beams or adjustable feet at the links. The reason it matters is the junction between modules: a pad that settles differently racks the corridor frame, and doors and sliding panels are the first to show it, so this is settled on paper before concrete.
Do I need a building permit?
Rules vary by country and municipality — some treat relocatable units as temporary structures, others require a filing. Our advisors can supply drawings and specifications for submission, and we recommend checking with your local authority before ordering.
Can it be relocated later?
Yes. The unit is designed for crane lifting and road transport, so it can move with your project or be resold as a relocatable asset. That flexibility is the main advantage over a conventional extension, which can only be demolished.
How fast can a multi-container home be ready to live in?
Most units are placed on prepared footings, connected to power and water, and ready to occupy within days of delivery. The box arrives finished — walls, wiring, flooring and the fitted bathroom on equipped options are all done at the factory. Count on 4–8 weeks of production plus 3–6 weeks of freight to your port.
How do two modules of a multi-container home join without leaking at the gap?
As a link with its own details, not two boxes pushed face to face. A roof valley over the gap takes a lined channel, the joint keeps a movement allowance so the lap can open and close without tearing the seal, and linings run through the corridor so insulation is not broken at the meeting. Glazing and door positions are aligned at drawing stage, because a seam missed by a few centimetres cannot be corrected on site. Our advisor sends the junction detail with the dimension drawings.
In a stacked multi-container home, what actually carries the upper module?
Each module is made to bear through its corner posts, so the upper unit lands on the one below at those four points rather than along the wall line, held square by pins or bolted plates that take wind and crane handling. Continuous elements — a corridor deck, a terrace, a plant zone — need a transfer frame of their own, drawn as part of the layout. Which arrangement your site gets is confirmed by a local engineer working from the dimension drawings your advisor supplies.
Can doors, windows and the layout be customised?
Yes — door and window positions, partitions, kitchenette and bathroom modules are configured before production, and colours are selectable. Send us your intended use and we will propose a layout before anything is cut.
Related models
Tell us your project.
We'll quote in 24 hours.
Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.