Park model home for holiday and residential parks, sited to the park’s own rules
A park model built for one journey: a chassis that stays under a compact home, a four-season shell, a covered porch at the door and hookups that meet the park pedestal on the day it lands.
- A loft over the bedroom, reached by a fixed stair.
- Piers, tie-downs and a skirt detailed to the park's appearance code.
- Delivered through the gate and set on the pitch in one lift.
- A chassis welded in for the delivery and left under the home.
- A four-season envelope with an insulated, closed underside.
Choose a configuration
A park model built for one journey: a chassis that stays under a compact home, a four-season shell, a covered porch at the door and hookups that meet the park pedestal on the day it lands.
A chassis that stays under the home
The steel chassis is welded into the floor and fitted with axles, brakes and a coupling for the delivery, then left in place once the home is set on its piers. Because it is not built to tour, the body can be wider and the ceiling higher than a caravan that has to fit a lane every weekend.
A four-season shell for a park pitch
Walls, roof and floor are insulated as one build-up, and the underside is closed with an insulated panel and a skirt so wind does not strip warmth from the floor. Windows and the door are placed with the prevailing weather in mind, because a park pitch often faces the wind that comes across open ground.
A porch, a loft and a kitchen facing the view
The plan starts at the porch: the door opens into a living space with the kitchen along the side wall and the view kept clear at the far end. A loft over the bedroom takes overspill sleeping or storage, reached by a fixed stair rather than a ladder, and the bathroom sits between the two sleeping zones. It is bought for family homes.
Hookups that meet the park pedestal
Power, water, waste and propane arrive on one side of the home, with inlet heights and thread types agreed with the park before production. The water heater and the furnace sit close to that wall so the runs stay short, and the condensate and pressure relief discharge where they can be seen and serviced.
One delivery, through the park gate
The home arrives on a low-loader and is lifted or rolled onto its pitch, and the park's own access decides the route: gate width, internal roads, overhead wires and the approach to the pitch are confirmed before the date. An escort and a permit may be needed on the road, while inside the park a banksman walks the load through the tight corners.
Anchored, skirted and accepted by the park
The home is set on piers or a prepared pad, tied down at the chassis corners and closed with a skirt that matches the park's appearance code. Steps and a deck are added after levelling, and the park inspects the siting before connection, so the drawings are agreed with them before production.
| Sleeps | NaN |
|---|
Included as standard
- Prefabricated structural frame
- Roof and wall panels
- Doors and glazing
- Insulation package
- Fastening system
- Numbered assembly drawings
Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.
What is the difference between a park model and a tiny house on wheels?
A tiny house on wheels is built to travel regularly and to fit road limits, with a chassis, tanks and a compact plan that survives towing. A park model is built for one delivery to a pitch, so the body can be wider, the ceiling higher and the porch fixed at the door, and the services are arranged for a park pedestal rather than for independence. If the home will move every season, the tiny house is the better tool; if it stays, the park model gives more room for the same footprint.
What does a park usually require about siting and appearance?
Parks hold firm views on the visible parts: the footing type — blocks, pads or piers — how the home is anchored, the skirting material and colour, and often the roof profile and the cladding palette too. Those rules shape the drawings more often than buyers expect, and they are not decoration: they decide whether the unit is accepted on the pitch. Put the park’s siting requirements and any appearance code in front of your advisor before the specification is approved, so the match happens on paper rather than after production has started.
Can the home be lived in year-round, or will the park object?
That is settled by the park rules and local regulations, not by the building: some parks restrict residents to a season, some limit occupancy to one household, some insist the home stays where it was first sited. Ask in writing whether full-time residence is permitted, and on what terms, before ordering. The unit itself can be built for it — a fuller insulation build-up, heating, a permanent supply — and your order paperwork then records the use you declared rather than assuming it.
What connections does a park pitch provide, and what arrives with the home?
Pitches are prepared to the points the park works to: power at the park’s supply arrangement, water and waste, and often a gas point or a data run. On the home side, inlet positions, cable and pipe sizes and the connection type are drawn to match what you send us, so the skirt closes around clean connections instead of a stack of adaptors. If the park issues its own connection requirements, pass them to your advisor before production starts — it is far easier to design around them than to retrofit.
Is a park model home specified for four-season use?
It is specified for the season you declare: wall and roof build-ups, glazing and heating are chosen against the winter you describe, and the underfloor edge and the skirt are closed so wind is not stripping warmth away at floor level. Year-round living also means controlling condensation, so ventilation and moisture routes are designed in from the start rather than drilled later. Tell us how cold the park gets, how long you mean to stay and how the home is heated, and the specification you receive will be written for those conditions.
How does a home get into a park and onto its pitch?
It travels on a road chassis or as a loaded module depending on the size, and the park’s own access decides the route: gate widths, turning areas, overhead wires, low tree limbs and the approach to the pitch are all confirmed before a delivery date is fixed. On arrival the unit is positioned with a crane or lifted onto prepared footings, then levelled, held down, connected and skirted. Send your advisor a plan and photographs of the pitch — access questions cost far less answered there than on delivery day.
How long does it take to assemble a park model home?
Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.
What foundation does it need?
A concrete slab, strip footings or pier foundations are all suitable, depending on soil and local practice. We supply the connection details for each option, so your local builder can prepare the base while the kit is in production.
Tell us your project.
We'll quote in 24 hours.
Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.