Site office planned around shift change, not an average day
A site office arrives as a finished block with lockers, drying room and showers already fitted, so the contractor moves in without waiting for concrete to cure or paint to dry.
- Shutters and a single key suite planned with your security regime.
- A drying room fed with warm air at the boot rail, so workwear is dry for the next shift.
- Dirty and clean routes kept apart, so mud stops at the entrance instead of crossing the canteen.
- Corner lifting eyes and a braced deck for crane moves between phases and sites.
- One board, one water entry and one drain, so the temporary supply reaches a single point.
Choose a configuration
A site office arrives as a finished block with lockers, drying room and showers already fitted, so the contractor moves in without waiting for concrete to cure or paint to dry.
A steel body built to be lifted every few months
The frame is a welded steel box with lifting eyes at the corners and a floor deck braced so the body does not rack when it is slung. Because it is handled by crane rather than towed, the walls stay square through repeated moves and the door leaves still close on the same line at the next site. The frame is galvanised steel, with lifting eyes welded at the corner posts.
Cladding that takes a knock and a wash-down
Walls are insulated panels with a hard, flat skin, fixed so the joints drain outward and can be re-sealed from outside without taking down a lining. The wet rooms get their own tanked lining, which runs behind the shower valve and turns into the floor, so splashes never find the panel joint.
A route from the gate to the sink that works at shift change
The plan separates dirty from clean: boots come off at the entrance, workwear goes into the drying room, and the canteen sits beyond the shower line so wet bodies do not cross it. Lockers face the drying room rather than the eating area, which keeps the change queue out of the canteen. The block covers 200 m² of internal floor, split between the wet and dry sides. Typical uses include offices and construction sites.
One power entry, one water entry, a drying room that dries
Power lands at a single board with spare ways, so a later hand dryer or heater does not need a new supply. The drying room is heated and ventilated as one system: warm air enters low along the boot rail and leaves high, taking moisture out of the building instead of leaving it on the ceiling.
Finished rooms, linked on site
Units arrive with cubicles, benches, lockers and the drying rack already fitted, and the lorry is unloaded onto pads or a hardstanding. Linking two units takes a gasket, bolts and a short connection through the shared wall, not a new roof.
Set for the crane, the tanker and the walk from the gate
The block goes where the crane can reach it, a tanker can reverse to the drain, and the walk from the gate is short enough that people use the boot wash. A stacked arrangement needs a stair tower and a landing, so the footprint is planned around the stair rather than squeezed in beside it. A single unit is delivered at 200 m² and can be linked to extend the block.
| Internal area | 200 m² |
|---|---|
| Structure | galvanised steel |
Included as standard
- Structural steel module
- Insulated wall and roof panels
- Doors and windows
- Electrical rough-in
- Interior finish
- Flooring
Typical lead time: production 4–8 weeks, freight 3–6 weeks depending on destination port.
What wears out when a site office is lifted and re-sited several times?
The lifting points and the door line take the strain, so both are detailed for repeat handling: corner castings for standard slings, doors hung so they can be adjusted after a move, and steps and balustrades that travel inside the unit rather than being left behind. Expect to check door alignment, seal compression and roof joints after each lift, and to touch in paint where slings have rubbed. The handling notes our advisor supplies list what to inspect before the crane is released.
Can a container office layout be customised?
Yes — window and door positions, partition walls, kitchenette and bathroom modules are configured before production, and colours are selectable. You also choose the fit-out level, from weather-tight shell to turnkey. Tell us how your team works and we will propose a floor plan.
How fast can a site office be up and running?
Most units are placed on prepared footings and connected to power within a few days of delivery. Because the module arrives pre-fitted — walls, wiring, finish and flooring included — site work is limited to foundations and hook-ups. Count on 4–8 weeks of production plus 3–6 weeks of freight to your port, so order with your move-in date in mind.
How is a site office locked up on a site that is working but empty at night?
Security is specified rather than assumed: a single key suite so a single key opens the block and none is left hanging in a padlock, lockable shutters over the canteen servery, and fixings that cannot be undone from outside. Whether that is enough depends on how the site is fenced, who holds keys and what your client or principal contractor requires, so we would not decide it for you. Tell us how the compound is secured and the door and window schedule is drawn to match.
What does a site office need from a temporary power and water supply?
The module arrives with its own distribution board, so the site supply only has to reach a single point: give your electrician the load you expect and the earthing arrangement used on site, and the connection is sized to suit. Water follows the same logic, with a single incoming pipe, a drain connection and the heater inside the unit. Voltages, pipe sizes and the position of the connection points differ from country to country and are fixed on the drawings our advisor supplies before production.
What maintenance does it need?
Very little: an annual check of roof seals and exterior paint, plus standard servicing of the HVAC unit. The galvanised or painted steel frame is designed for years of outdoor exposure, and the interior finishes wipe clean like any office.
How do you stop the drying room from steaming up the canteen?
The drying room is kept at a slightly lower pressure than the rooms around it, so moist air leaves through its own extract instead of drifting out of the door. That means a lobby or a door with a closer, an extract grille sized for the wet load, and a make-up air path from outside rather than from the canteen. If the room opens straight into the eating area, the door detail and the extract are changed before production, not fixed with a fan afterwards.
What floor finish survives muddy boots through the winter?
The wet side usually takes a vinyl with a welded seam and a coved skirting, laid to a gully so mud is hosed to the drain rather than scrubbed into a joint. A textured finish is chosen where boots come in wet, because a smooth surface becomes dangerous with clay on it. The canteen can take a heavier contract vinyl, but the junction between the two finishes needs a transition strip that a mop can pass over.
Related models
Tell us your project.
We'll quote in 24 hours.
Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.