Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

Site office planned around shift change, not an average day

A site office arrives as a finished block with lockers, drying room and showers already fitted, so the contractor moves in without waiting for concrete to cure or paint to dry.

Why this home
  • A drying room fed with warm air at the boot rail, so workwear is dry for the next shift.
  • Dirty and clean routes kept apart, so mud stops at the entrance instead of crossing the canteen.
  • Corner lifting eyes and a braced deck for crane moves between phases and sites.
  • One board, one water entry and one drain, so the temporary supply reaches a single point.
  • Cubicles, benches and lockers fitted in the factory, not assembled in a muddy compound.

Choose a configuration

From $300 / set Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

A site office arrives as a finished block with lockers, drying room and showers already fitted, so the contractor moves in without waiting for concrete to cure or paint to dry.

A steel body built to be lifted every few months

The frame is a welded steel box with lifting eyes at the corners and a floor deck braced so the body does not rack when it is slung. Because it is handled by crane rather than towed, the walls stay square through repeated moves and the door leaves still close on the same line at the next site.

Cladding that takes a knock and a wash-down

Walls are insulated panels with a hard, flat skin, fixed so the joints drain outward and can be re-sealed from outside without taking down a lining. The wet rooms get their own tanked lining, which runs behind the shower valve and turns into the floor, so splashes never find the panel joint.

A route from the gate to the sink that works at shift change

The plan separates dirty from clean: boots come off at the entrance, workwear goes into the drying room, and the canteen sits beyond the shower line so wet bodies do not cross it. Lockers face the drying room rather than the eating area, which keeps the change queue out of the canteen. Typical uses include offices, family homes and garage conversions.

One power entry, one water entry, a drying room that dries

Power lands at a single board with spare ways, so a later hand dryer or heater does not need a new supply. The drying room is heated and ventilated as one system: warm air enters low along the boot rail and leaves high, taking moisture out of the building instead of leaving it on the ceiling.

Finished rooms, linked on site

Units arrive with cubicles, benches, lockers and the drying rack already fitted, and the lorry is unloaded onto pads or a hardstanding. Linking two units takes a gasket, bolts and a short connection through the shared wall, not a new roof.

Set for the crane, the tanker and the walk from the gate

The block goes where the crane can reach it, a tanker can reverse to the drain, and the walk from the gate is short enough that people use the boot wash. A stacked arrangement needs a stair tower and a landing, so the footprint is planned around the stair rather than squeezed in beside it.

Site office planned around shift change, not an average day — Specifications
External size5,950 × 3,000 × 2,800 mm
GlazingDouble glazing
StyleModern

Included as standard

  • Structural steel module
  • Insulated wall and roof panels
  • Doors and windows
  • Electrical rough-in
  • Interior finish
  • Flooring

Typical lead time: production 4–8 weeks, freight 3–6 weeks depending on destination port.

Can a container office layout be customised?

Yes — window and door positions, partition walls, kitchenette and bathroom modules are configured before production, and colours are selectable. You also choose the fit-out level, from weather-tight shell to turnkey. Tell us how your team works and we will propose a floor plan.

How is a site office locked up on a site that is working but empty at night?

Security is specified rather than assumed: a single key suite so a single key opens the block and none is left hanging in a padlock, lockable shutters over the canteen servery, and fixings that cannot be undone from outside. Whether that is enough depends on how the site is fenced, who holds keys and what your client or principal contractor requires, so we would not decide it for you. Tell us how the compound is secured and the door and window schedule is drawn to match.

What does a site office need from a temporary power and water supply?

The module arrives with its own distribution board, so the site supply only has to reach a single point: give your electrician the load you expect and the earthing arrangement used on site, and the connection is sized to suit. Water follows the same logic, with a single incoming pipe, a drain connection and the heater inside the unit. Voltages, pipe sizes and the position of the connection points differ from country to country and are fixed on the drawings our advisor supplies before production.

How fast can a site office be up and running?

Most units are placed on prepared footings and connected to power within a few days of delivery. Because the module arrives pre-fitted — walls, wiring, finish and flooring included — site work is limited to foundations and hook-ups. Count on 4–8 weeks of production plus 3–6 weeks of freight to your port, so order with your move-in date in mind.

What wears out when a site office is lifted and re-sited several times?

The lifting points and the door line take the strain, so both are detailed for repeat handling: corner castings for standard slings, doors hung so they can be adjusted after a move, and steps and balustrades that travel inside the unit rather than being left behind. Expect to check door alignment, seal compression and roof joints after each lift, and to touch in paint where slings have rubbed. The handling notes our advisor supplies list what to inspect before the crane is released.

How is a welfare block sized for the busiest shift?

Provision is counted against the peak, not the average: wc positions, shower heads, drying hooks and canteen seats are each counted on the plan, with a separate allowance for visitors and for an alternative shift pattern. What those counts must be is set by the health-and-safety regime where you build and often by the client's own standards, so we do not invent a ratio. Send your peak headcount and the layout mark-ups our advisor supplies will show how the block meets it.

What happens on site between delivery and the block being in use?

The lorry brings finished units, so site work is offloading, setting them on prepared supports, linking them and making the service connections; partitions, fittings and finishes are already in. How long that takes depends on the number of units, crane access and whether the temporary supply is live on arrival. A stacked arrangement adds stairs, a landing and a walkway between levels, supplied with the block. The order of work is set out in the installation drawings our advisor supplies.

How does the drying room get workwear dry overnight?

A drying room is heated and ventilated as a single system: warm air enters low along the boot rail and leaves high, so moisture goes out of the room instead of settling on the walls. Capacity depends on how many people change at the end of a shift and how wet they come back, so tell us the trades on site and the season you build through. Heater output and air change rate are stated on the specification sheet our advisor supplies for you to approve.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — Site office planned around shift change, not an average day