Container house for family homes, villa projects and staff dormitories
A welded steel box with a timber-lined interior, craned onto its pads in one lift and connected that day.
- The frame is container-grade steel, so the shell keeps its shape through repeated lifts.
- Partitions can be moved inside the frame, so a staff block can later become guest rooms.
- Openings are framed and glazed before dispatch, so no hot work happens on a finished site.
- The unit travels as ordinary freight, closed and braced, with the interior already installed.
- Repairs stay local: a damaged panel is replaced without stripping the room behind it.
Choose a configuration
A welded steel box with a timber-lined interior, craned onto its pads in one lift and connected that day. The frame carries the load; the lining, the services and the finished rooms sit inside it.
The box is a frame, not a wall
A container house starts as a welded steel frame of corner posts, upper and lower rails, and four castings that take every lift. The wall panels only close that frame, so the load runs from the castings through the posts, and it does the same job whether the box stands alone or carries another above it. The frame is container-grade steel.
Ribs conduct heat, the lining breaks the path
Steel is a good conductor, so every rib and rail carries warmth out through the wall and becomes the place where condensation appears first. The insulation fills the cavity between ribs, a vapour check goes on the warm side, and the lining crosses the ribs in a continuous layer so the inner face stays dry.
One freight footprint, several ways to use it
The unit keeps the standard freight footprint, which is why it loads on an ordinary flatbed and stacks in a yard without a special frame. The plan is drawn inside that footprint: partitions can move, the corner posts cannot, so rooms are set out around the posts rather than cut through them.
Openings are framed, seams are gasketed
A window in a container wall is not simply cut out: the opening gets a frame tied back to the posts, and the reveal gets a sill that throws water clear of the face. Where two boxes are joined, the connection is made at the castings and the seam closes on a gasket line, so the joint moves with the boxes instead of cracking.
Lifted at the castings, locked at the deck
Every lift goes through the four corner castings, never under the floor, and the same castings take the twist locks that hold the box on a trailer or on the unit beneath. That is what makes a finished room shippable: it travels closed, arrives braced, and opens onto its pads with the interior already built.
Site office, staff block, spare room
One shell serves as a site office with a counter and a WC, as staff housing with bunk rooms, or as a garden room that needs no concrete pour. What changes between them is the fit-out and the number of openings, not the frame, so a second box can be added to the first without starting the drawings again. It is usually fitted out for family homes, villa projects and staff dormitories.
| Structure | container-grade steel |
|---|---|
| Colours | Custom colours |
Included as standard
- Structural steel base frame
- Insulated wall and roof panels
- Doors and windows
- Electrical fit-out
- Bathroom pod (fitted options)
- Flooring
Typical lead time: production 4–8 weeks, freight 3–6 weeks depending on destination port.
How fast can a container house be ready to live in?
Most units are placed on prepared footings, connected to power and water, and ready to occupy within days of delivery. The box arrives finished — walls, wiring, flooring and the fitted bathroom on equipped options are all done at the factory. Count on 4–8 weeks of production plus 3–6 weeks of freight to your port.
What is already installed when a container house arrives?
Insulation, interior lining, flooring, doors, windows and the electrical rough-in are fitted in the workshop; sanitaryware and kitchen units come with the equipped versions. On site, only the foundation, service connections and any bespoke joinery remain.
Can I stack two container homes, and what does the upper one sit on?
The upper unit sits on the corner castings of the lower one and is tied through the same fittings with twist locks or a welded connection, so the load passes down the posts rather than through the roof. Stacking is a structural decision, so the lower box and its pads have to be checked for the combined weight and for wind uplift. Ask for the stacking arrangement to be drawn before production, because the roof and floor edges are detailed differently on a stacked pair.
What does the crane need, and can the unit be unloaded without one?
A finished container house is lifted at its four castings, so the crane or telehandler needs a spreader that reaches them and firm ground for its outriggers. Unloading without a crane is possible only for a stripped box on a trailer with a tipping or sliding bed, and the fit-out does not survive that. Send the site plan and the access width before booking transport, because the lift is the step that decides the delivery day.
Can it be relocated later?
Yes. The unit is designed for crane lifting and road transport, so it can move with your project or be resold as a relocatable asset. That flexibility is the main advantage over a conventional extension, which can only be demolished.
Do I need a building permit?
Rules vary by country and municipality — some treat relocatable units as temporary structures, others require a filing. Our advisors can supply drawings and specifications for submission, and we recommend checking with your local authority before ordering.
What maintenance does it need?
Very little: an annual check of roof seals and exterior paint, plus standard servicing of the HVAC unit. The galvanised or painted steel shell is made for long outdoor exposure, and interior surfaces clean like any modern home.
Can doors, windows and the layout be customised?
Yes — door and window positions, partitions, kitchenette and bathroom modules are configured before production, and colours are selectable. Send us your intended use and we will propose a layout before anything is cut.
Related models
Tell us your project.
We'll quote in 24 hours.
Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.