Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

Two-story prefab home for family homes, retail units and food service

A two-story house buys floor area from the same plot, and the stair decides almost everything else: where the bedrooms sit, how the wet rooms stack and how the house is raised in sections.

Why this home
  • A braced stair core that keeps both levels square during assembly and after.
  • Insulation carried past the joist ends, so the floor band does not become a cold bridge.
  • Bathrooms stacked over the kitchen, on one drainage stack for the whole house.
  • Bedrooms on the quiet side, with a landing for linen and the vacuum.
  • Ground floor braced first, upper sections lifted and bolted before the roof.

Choose a configuration

From $550 / set Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

A two-story house buys floor area from the same plot, and the stair decides almost everything else: where the bedrooms sit, how the wet rooms stack and how the house is raised in sections.

The stair core ties the two levels together

The stair is not fitted into a finished house; it is part of the frame, and its walls work as a braced core that keeps both levels square with each other. Upper-floor joists land on the wall heads and are tied back to that core, so the building resists racking before the partitions and the roof are in place.

The floor band is where heat escapes

The line between the two storeys is the hardest part of the envelope: the floor structure crosses the wall, the joists interrupt the insulation, and outside air reaches the wall head from both sides. That band is built as a closed detail, with the insulation running past the joist ends and the air barrier taped before the cladding goes on.

Stairs in the middle, bedrooms above

Putting the stair at the centre of the plan shortens the upstairs corridor and lets the bathrooms stack directly over the kitchen and utility. Bedrooms go on the quiet side, the landing takes the linen and the vacuum, and the double-height space over the entrance stays small enough that it does not cost a room. It is built for family homes, retail units and food service.

One wet stack serving both floors

The bathroom, the shower room and the kitchen share a vertical drainage stack, which is why the upper layout follows the lower one rather than the other way round. The boiler sits close to that stack so hot water does not travel across the house, and the upper emitters come off a manifold on the same wall.

The upper floor goes on once the lower is tied

The ground floor is assembled and braced first, then the upper sections are lifted onto the wall heads and bolted down before the roof follows. Props and temporary ties stay in place until the roof structure is complete, because a two-story frame is stable in its finished state, not halfway through.

A small footprint with a long shadow

Building upwards keeps the garden, but the taller elevation throws a shadow that has to be checked against the neighbour's windows and against the terrace you plan to use in the evening. Wind speed rises with height, and the crane or scaffold position at the boundary often decides which side the sections are lifted from.

Two-story prefab home for family homes, retail units and food service — Specifications
Storeys2
ColorsCustom colours
StyleModern

Included as standard

  • Prefabricated structural frame
  • Roof and wall panels
  • Doors and glazing
  • Insulation package
  • Fastening system
  • Numbered assembly drawings

Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.

Can a two-story prefab home be built on a tight or sloping site?

Usually yes, because the way the building is divided for delivery is chosen around your access, not fixed by the design: on a narrow approach the two levels come as panels and deck cassettes instead of large modules. A crane or telehandler still needs firm, level ground to stand on and room to swing, so send photographs and your site plan and your advisor proposes the split that fits.

How does furniture get upstairs in a two-story prefab house?

Through the stair, which is why its width, its turning point and the landing are drawn around a bed base and a wardrobe rather than around the handrail. A straight flight takes more corridor but moves furniture easily; a winder saves space and is the reason people end up hoisting a mattress over a balcony. Tell your advisor which rooms are upstairs before the stair is fixed, and the plan can include a removable balustrade or a window that opens wide enough for the awkward items.

How long does it take to assemble a two-story prefab home?

Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.

What foundation does it need?

A concrete slab, strip footings or pier foundations are all suitable, depending on soil and local practice. We supply the connection details for each option, so your local builder can prepare the base while the kit is in production.

Can the layout be customised?

Yes — window positions, glazing size, the number of bedrooms and the balcony deck are adjusted before production. The kit ships numbered and pre-drilled for the plan you confirm, so late changes are the expensive kind. Finalise the plan with our advisors, then the factory cuts.

Are the stairs part of a two-story prefab home, or added later?

They are drawn with it: the flight, its landing and the guarding are fixed on the drawings alongside the floor opening, and the stair arrives either assembled or as a packaged flight put in straight after the floor deck. A stair core shapes both levels and the run of services, so settle its position before production. Moving it afterwards means redrawing the layout of the storey.

How is the upper storey supported while the house is being assembled?

The ground-level walls and the floor deck go first onto the prepared base, and the upper floor plates bolt into their wall heads. The props you see at that stage carry the deck only until the bracing panels and bolts are tightened, after which the frame works as one piece and the temporary supports come away. That sequence is written into the assembly guide rather than left to the crew’s judgement.

Does a two-story prefab home need extra structural checks for wind?

A taller building catches more wind, so the joint between the two levels and the fixing down to the base are engineered rather than assumed. We supply the load and reaction data for the configuration you order, and your local engineer compares it with the wind and snow rules that apply where you build. Those rules vary from place to place, so have the check done before ordering.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — Two-story prefab home for family homes, retail units and food service