Detached ADU on levelling pads, no poured foundations
A detached ADU built as a panel kit: frame, envelope and interior arrive numbered and ready to assemble, with the plan drawn around the way the building will actually be lived in.
- Factory-cut, numbered parts turn assembly into days of bolting rather than weeks of carpentry.
- A plan built around a real kitchen, bathroom and sleeping zone, not one open box.
- Services meet at one wall, so power, water and waste arrive through a single trench.
- Ships flat on a standard trailer and goes up in sections on a prepared base.
- Set on pads or piles, it can be re-levelled later or lifted onto a trailer and moved.
Choose a configuration
A detached ADU built as a panel kit: frame, envelope and interior arrive numbered and ready to assemble, with the plan drawn around the way the building will actually be lived in.
A galvanised frame that arrives as a kit
Every post, beam and connector is cut and labelled at the factory, so the frame goes together in a fixed sequence instead of being measured and cut on site. Galvanised steel carries the roof load and the lifting points, which lets the structure be craned over a fence and set down in a garden with no rear access.
An envelope that holds its temperature
Walls, roof and floor are built as insulated panels rather than a stud frame filled on site. That gives one continuous layer with few thermal bridges, so the interior does not swing with the weather and heating or cooling demand stays modest.
A plan that lives like a house, not a shed
The layout is drawn around a kitchen wall, a bathroom pod and a separate sleeping zone, with the living space left open to the glazed end. Doors and corridor widths are set so furniture can be carried in after assembly rather than lifted through a window.
Services routed before the panels close
Electrical and plumbing runs are set out on the drawings and installed while the walls are still open, so nothing has to be chased into a finished surface later. The service wall faces the point where power, water and waste arrive from the main house, keeping the trench short and the connections accessible.
Delivered in sections, assembled on your base
The kit ships flat-packed on a standard trailer and is carried or lifted to the base in sections a small crew can handle. Assembly follows numbered drawings: frame first, then floor, walls and roof, with the envelope closed before interior fit-out begins.
Sited for privacy, built to stay put
Position is decided on the drawings: the footprint, roof line and glazed side are set to keep privacy from the main house without shading its windows or taking the best part of the garden. Setbacks, overlooking and separation distances are checked against local rules before the base is marked out.
| Style | Modern |
|---|
Included as standard
- Prefabricated structural frame
- Roof and wall panels
- Doors and glazing
- Insulation package
- Fastening system
- Numbered assembly drawings
Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.
What is the difference between a detached ADU and a container home?
A container home starts from a steel box with fixed internal dimensions; this unit is built as a panel kit around a frame, so the plan, roof line, glazing and wall finish are set before production. That makes it easier to fit a narrow garden, match the main house and add rooms without cutting structural steel. The trade-off is that the kit needs assembly on site rather than arriving as one finished box.
How long does it take to assemble a detached ADU?
Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.
What foundation does it need?
A concrete slab, strip footings or pier foundations are all suitable, depending on soil and local practice. We supply the connection details for each option, so your local builder can prepare the base while the kit is in production.
Can the layout be customised?
Yes — window positions, glazing size, the number of bedrooms and the balcony deck are adjusted before production. The kit ships numbered and pre-drilled for the plan you confirm, so late changes are the expensive kind. Finalise the plan with our advisors, then the factory cuts.
Can a detached ADU be rented out for income?
Usually yes, but on terms: many authorities allow long-term letting of one accessory unit per house, ask for registration or a visit, and keep short stays to a limited number of nights. Separating the unit onto its own title is rarely permitted, since it must stay with the main dwelling. Your advisor supplies the drawings and specification sheet your local office asks for, and the letting rules are the part to confirm there before the layout is fixed.
How do power, water and waste reach the detached ADU across the garden?
The three services normally run in one trench from the house to a prepared entry point, and the wiring and plumbing inside the unit are drawn to meet those arrivals. Your local contractor digs and lays the runs and arranges the connection checks that apply; many owners add a sub-meter on the unit side so a tenant’s usage can be billed separately. Tell your advisor where the board, the stop valve and the drain are, and the drawings turn the service wall toward them.
Can the detached ADU be placed when the garden is only reachable through a side gate?
Access is planned before you order. If a vehicle cannot reach the lawn, the unit arrives in sections and is assembled on the prepared base, and the route, the fence line and the paths are measured and photographed with your advisor first. Grass, beds and paving are protected during placement, and any fence panel taken down is recorded so it goes back. Send a photo of the gate and the route, and your advisor tells you which delivery method suits your site.
What kind of base suits a lawn or soft ground?
A point-supported base works well there: levelling pads or screw piles carry the frame clear of the grass, so water drains through and a mower can pass underneath without any concrete pour. The ground only has to be firm and the pads set to one plane, which is why the site is surveyed before the base is laid. And because nothing is poured, the unit can be re-levelled years later or lifted off entirely.
Related models
Tell us your project.
We'll quote in 24 hours.
Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.