Flat pack house shipped in containers and assembled on a level base
A flat-pack house arrives as numbered panels, posts and cassettes cut to a fixed plan, and the crew on site assembles a closed shell with factory-made openings, ready for the trades that follow.
- Panels, posts and beams cut to one plan in the factory.
- Sheathing and ring beams that turn four walls into a braced box.
- Insulation, membrane and cladding already in each wall cassette.
- Openings cut on the factory line, not on site.
- Conduits and pipe sleeves set into the panels before packing.
Choose a configuration
A flat-pack house arrives as numbered panels, posts and cassettes cut to a fixed plan, and the crew on site assembles a closed shell with factory-made openings, ready for the trades that follow.
Panels that brace each other into a box
Wall, floor and roof panels are cut and framed in the factory, then packed flat with the posts and beams that tie them together. Once the panels are stood and fixed, the sheathing and the ring beams turn the separate walls into a braced box, which is what stops a light building from racking in wind. The panels are framed in galvanised steel, tied by posts and ring beams.
A wall build-up that travels flat
Each wall is a cassette with its insulation, membrane and cladding already in place, so flat packing does not mean a thinner envelope than a panelled house built in a workshop. The membrane is left lapped at the edges and taped on site, and the cladding is set to a gauge that keeps a consistent shadow gap at the corners.
Openings cut on the factory line
Windows and doors are cut on the factory line from a plan fixed before cutting, so the openings land where the kitchen and the stairs need them rather than being moved on site. Partitions arrive as separate panels with the door casings fitted, and the wet rooms are grouped so the drainage can run in one zone.
Services pulled through prepared holes
First-fix conduits and pipe sleeves are set into the panels at the factory, with the runs drawn on the panel schedule and the ends capped for transport. On site the electrician pulls through the prepared holes and the plumber connects at the wet wall, which keeps the second fix off the finished lining.
Bundles that arrive in build sequence
Panels travel on edge in bundles that follow the build sequence, with the floor bearers, the walls of each elevation and the roof cassettes loaded in the order they are needed. A container or a flatbed unloads with a forklift or a telehandler, and the bundles stay strapped until the crew reaches them so nothing is picked twice.
A base in tolerance and a marked set-out
The base is set out from the panel dimensions, not from the overall footprint on the brochure, because a few millimetres at the corner becomes a gap at the ridge. A levelled slab, screw piles or a ring beam give the crew a datum, and the panels are fixed down at the corners and along the wall lines before the roof goes on.
| Structure | galvanised steel |
|---|---|
| Style | Modern |
Included as standard
- Prefabricated structural frame
- Roof and wall panels
- Doors and glazing
- Insulation package
- Fastening system
- Numbered assembly drawings
Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.
Can the kit be stored on site for weeks without damage?
Bundles are stored on bearers on firm, drained ground, kept strapped and sheeted so water runs off rather than into the stack, with the membrane and the lining protected from sun and grit. The site needs a flat, secure area where a telehandler can reach each bundle without moving the ones behind it. If storage runs into months, the wrapping and the exposed edges are checked before the build starts.
How are corners and openings made weathertight?
The membrane is left wrapped around the panel edges so it can be lapped and taped across the corner once the panels are fixed, and the cladding is set to a gauge that leaves a straight shadow gap for the corner trim. Openings are cut in the factory with a sill and a head detail, and the window or door is fitted with a backer rod and sealant on the outside and an airtight tape on the inside. The sequence matters: the tapes go on before the services are pulled, not after the lining is closed.
How does a crew know which panel goes where?
Every panel carries a code that matches the panel schedule and the setting-out drawing, and the corners of the building are marked on the base before the first piece is stood. The schedule gives the elevation, the position in the run and the fixing pattern, so the crew can check a panel against the drawing before it leaves the stack. Consistent coding matters more than colour, because a wrong panel found late is a crane lift wasted.
How are the panels lifted, and what lifting points are built in?
Wall panels are usually lifted on edge with a sling or a lifting beam fixed to points marked on the frame, because a panel carried flat will bend its own lining. Roof cassettes and long floor units need a spreader so the load stays even, and the schedule states the weight and the centre of gravity of each piece. A forklift can move bundles around the site, but panels are not lifted by the window openings.
Do the panels arrive finished, and what touching up is needed?
Interior linings are usually factory-primed or finished, and external cladding arrives coated, so the site work is limited to filling fixing heads, sealing joints and touching up the cut edges where services come through. A painted panel should be touched up with the same product and sheen, or the repair will show in raking light. Skirting, trims and any site-cut boards are the parts that need painting after assembly.
What happens if a panel is damaged in transit?
The delivery is checked against the packing list before the driver leaves, with photographs of any crushed corner, torn membrane or bent frame. A damaged lining or a scuffed cladding board can usually be repaired on site, while a bent frame or a broken cassette is replaced by the factory, which is why the panels are coded and the schedule lists each one. Reporting on the day keeps the replacement in the same lead time as the rest of the kit.
What makes a panelled house rigid again once the panels are up?
Each panel arrives as a framed unit in its own right, and the house turns rigid where panels meet: corner posts, screwed stud lines through the mating frames and a roof diaphragm tied back into the wall heads. That connection schedule is drawn before production rather than improvised on site, which is what allows an opened plan to work without posts down the middle. Fixings are listed junction by junction in the guide, so the crew can confirm each one is made before the lining closes over it.
Does flat-packing compromise the insulation or the services?
No, because both are planned around the packing: wiring runs and pipe positions are marked on the panel drawings, with pre-cut openings travelling in the bundle, so electricians and plumbers on site pull through rather than cut new holes. Insulation ships in its own wrapped bundle and is cut to the clear depth between studs, so nothing arrives compressed. Where a service wall is pre-built, it travels as a protected module of its own and is set in place before the linings close.