Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

Log cabin in kiln-dried logs, with eaves that work for the walls

A log cabin delivered with every piece marked: the logs are machined and numbered in the yard, the openings are cut before dispatch, and the work on site comes down to stacking in order on a base that has already been levelled.

Why this home
  • A raised plinth and deep overhangs that keep splash off the bottom course.
  • Loft space under the roof used for sleeping or for storage.
  • Every log marked with its wall and course before it leaves the yard.
  • Logs machined to a profile, with the corner notch cut to match.
  • Threaded rods and slotted fixings that let the wall settle without splitting.

Choose a configuration

From $280 / m² Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

A log cabin delivered with every piece marked: the logs are machined and numbered in the yard, the openings are cut before dispatch, and the work on site comes down to stacking in order on a base that has already been levelled.

Round logs, square logs, and the corner joint

The wall is built from logs machined to a profile, either round with a full face or cut square, and each course locks into the next at the corner through a notch shaped to that profile. The profile decides how the wall moves as it dries, which is why it is settled before the first log is turned.

Built to settle without opening a gap

Fresh logs give up moisture and the wall loses height, so the build-up allows for that movement: threaded rods, fixings with slotted holes at the openings and a reserve above the window heads that closes over the first seasons. Gaskets and seals work inside the joint between logs instead of being asked to hold the movement back.

A ground floor in the round, a loft above

The plan usually keeps the main space as one room around the stove, with bedrooms on the ground floor and a loft under the roof for sleeping or storage. The stair is set against a wall that does not move, so the flight is never hung on a log face that is still coming down. It is built for family homes and resort stays.

Services routed outside the log face

Cables and pipes run in surface trunking, in a service wall or inside the floor zone, because chasing a log removes the section that carries the load and cannot be made good once the wall has come down. Boxes are cut at the factory into a batten on the inner face, with the cable entry slotted so the wall can keep settling.

Logs numbered by wall and by course

Each log arrives marked with its wall and its course, and the openings come already cut, so the site work is stacking rather than measuring and sawing. Bundles travel wrapped and are stored clear of the ground, because a log that drinks water on site will move further once the house is closed.

Roof overhang, plinth and ground drainage

A log wall lasts longer under a deep overhang, on a plinth that lifts the bottom course above splash, and with the ground falling away from the base on every side. Pitch and overhang are set against the snow and rain the plot gets, not copied from a catalogue sheet.

Log cabin in kiln-dried logs, with eaves that work for the walls — Specifications
StyleRetro
MaterialTimber

Included as standard

  • Prefabricated structural frame
  • Roof and wall panels
  • Doors and glazing
  • Insulation package
  • Fastening system
  • Numbered assembly drawings

Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.

How long does it take to assemble a log cabin?

Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.

Is the warmth of a log cabin from the mass of the logs or from insulation?

Both, and they work differently: a thick log wall stores heat and buffers the rooms through the day, but on its own it insulates less than a framed wall with a full cavity. Cabins for cold sites are therefore specified as logs plus a build-up — an inner frame with insulation and lining, or a laminated wall with an insulating core — with glazing and heating matched to that wall. Which route your cabin takes is a drawing decision made against the winter you describe, not a catalogue default.

What foundation suits a log cabin, and how is the first course fixed?

Screw piles or a strip footing with a ventilated crawl space are the usual choices, and both need a level bearing surface to within a millimetre or so, because logs are stacked and not adjusted as you go. The bottom log is bedded on a damp course and tied down with threaded rods anchored into the base, so uplift from wind passes through the rod rather than through the weight of the wall alone. Your engineer sizes those anchors against the wind load at the site.

Can a log cabin be extended or moved later?

An extension works if it is planned as a separate volume with its own settlement and a movement joint where it meets the old wall, rather than bonded into the existing courses. Moving is realistic for a small cabin built in numbered courses, provided the roof and the openings are taken down in reverse order and the logs are re-marked. Once a wall has settled, some logs will not go back exactly as they came apart, so treat a move as a rebuild.

How much does a log wall settle, and what is built in for it?

A log wall takes up the moisture of its own climate and gives it back as it dries, so the wall loses height over the first seasons while the joints close up. That movement is designed for rather than resisted: openings are left with a pocket above them, fixings slide in it, and interior partitions are detailed to drop along with the wall. The drawing set shows where the settling allowance is left, and your advisor explains which pockets are packed out once the house has finished moving.

Can the layout be customised?

Yes — window positions, glazing size, the number of bedrooms and the balcony deck are adjusted before production. The kit ships numbered and pre-drilled for the plan you confirm, so late changes are the expensive kind. Finalise the plan with our advisors, then the factory cuts.

What foundation does it need?

A concrete slab, strip footings or pier foundations are all suitable, depending on soil and local practice. We supply the connection details for each option, so your local builder can prepare the base while the kit is in production.

How are doors and windows kept working in a wall that settles?

Openings sit inside a boxed header — a casing that carries the wall above it — with a compressible seal and sliding fixings, so when the wall comes down the frame is not squeezed and the glass is never loaded. That one detail is what prevents the stuck doors and cold draughts people expect from log buildings. The clearance left at each opening is drawn for your wall type: tell your advisor which joinery you want, and the head detail is set to follow it.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — Log cabin in kiln-dried logs, with eaves that work for the walls