Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

Log cabin for villa projects

A log cabin delivered with every piece marked: the logs are machined and numbered in the yard, the openings are cut before dispatch, and the work on site comes down to stacking in order on a base that has already been levelled.

Why this home
  • A raised plinth and deep overhangs that keep splash off the bottom course.
  • Loft space under the roof used for sleeping or for storage.
  • Every log marked with its wall and course before it leaves the yard.
  • Calculated for a service life of 40 years.
  • Logs machined to a profile, with the corner notch cut to match.

Choose a configuration

From $3,692 / set Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

A log cabin delivered with every piece marked: the logs are machined and numbered in the yard, the openings are cut before dispatch, and the work on site comes down to stacking in order on a base that has already been levelled.

Round logs, square logs, and the corner joint

The wall is built from logs machined to a profile, either round with a full face or cut square, and each course locks into the next at the corner through a notch shaped to that profile. The profile decides how the wall moves as it dries, which is why it is settled before the first log is turned. The structure is calculated for 40 years.

Built to settle without opening a gap

Fresh logs give up moisture and the wall loses height, so the build-up allows for that movement: threaded rods, fixings with slotted holes at the openings and a reserve above the window heads that closes over the first seasons. Gaskets and seals work inside the joint between logs instead of being asked to hold the movement back.

A ground floor in the round, a loft above

The plan usually keeps the main space as one room around the stove, with bedrooms on the ground floor and a loft under the roof for sleeping or storage. The stair is set against a wall that does not move, so the flight is never hung on a log face that is still coming down. The floor area is 12 m². It is built for villa projects.

Services routed outside the log face

Cables and pipes run in surface trunking, in a service wall or inside the floor zone, because chasing a log removes the section that carries the load and cannot be made good once the wall has come down. Boxes are cut at the factory into a batten on the inner face, with the cable entry slotted so the wall can keep settling.

Logs numbered by wall and by course

Each log arrives marked with its wall and its course, and the openings come already cut, so the site work is stacking rather than measuring and sawing. Bundles travel wrapped and are stored clear of the ground, because a log that drinks water on site will move further once the house is closed.

Roof overhang, plinth and ground drainage

A log wall lasts longer under a deep overhang, on a plinth that lifts the bottom course above splash, and with the ground falling away from the base on every side. Pitch and overhang are set against the snow and rain the plot gets, not copied from a catalogue sheet.

Log cabin for villa projects — Specifications
Floor area12 m²
Design life40 years
ColorsCustom colours
StyleModern

Included as standard

  • Prefabricated structural frame
  • Roof and wall panels
  • Doors and glazing
  • Insulation package
  • Fastening system
  • Numbered assembly drawings

Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.

How are the logs dried, and how should they be kept before assembly?

Logs and laminated wall elements come out of kiln drying at a moisture level suited to the climate they are shipped to, and travel in numbered bundles together with the roof, the joinery and the fixings list. On site the bundles want covering and raising off the ground from the day they are opened: the one mistake worth avoiding is letting a wall stand in the rain before the roof follows. Because the roof closes quickly behind the wall courses, the crew is planned so that exposed stage stays short, and your advisor can confirm the sequence set out in the fitting guide.

Which corner notch should I choose, and how is the corner kept airtight?

The notch is chosen with the profile and the climate: a saddle notch sheds water well on round logs, while a dovetail or a splined square joint locks the corner harder against wind. Either way the corner needs a gasket or a backer rod inside the joint and a close fit at the outer face, because that is where driving rain finds its way in. Ask to see a sample corner off the same machining line, not just a drawing.

How long does it take to assemble a log cabin?

Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.

What foundation does it need?

A concrete slab, strip footings or pier foundations are all suitable, depending on soil and local practice. We supply the connection details for each option, so your local builder can prepare the base while the kit is in production.

How do you keep wood-boring insects out of a log wall?

The first defence is dry wood: logs dried to a low moisture content, a roof that keeps the wall out of the weather, and a raised bottom course with air moving underneath. Insects go for sapwood, so ask whether the logs are cut from heartwood or from a species with little sapwood. Any local treatment is applied at the factory and renewed as the maker sets out, and standing water or soil stacked against the wall undoes it.

Can the layout be customised?

Yes — window positions, glazing size, the number of bedrooms and the balcony deck are adjusted before production. The kit ships numbered and pre-drilled for the plan you confirm, so late changes are the expensive kind. Finalise the plan with our advisors, then the factory cuts.

How are sockets and switches fitted without cutting into the logs?

The boxes are cut at the factory into a batten fixed to the inner face, or they go into a service wall, so no chase is cut into a log. Cables then run in trunking or behind the lining, with a slotted entry where the conduit leaves the wall. If you want an outlet on a particular course, say so at drawing stage, because adding one after the wall is up means surface trunking.

How much does a log wall settle, and what is built in for it?

A log wall takes up the moisture of its own climate and gives it back as it dries, so the wall loses height over the first seasons while the joints close up. That movement is designed for rather than resisted: openings are left with a pocket above them, fixings slide in it, and interior partitions are detailed to drop along with the wall. The drawing set shows where the settling allowance is left, and your advisor explains which pockets are packed out once the house has finished moving.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — Log cabin for villa projects