Single-story prefab home for family homes, hotels and offices
A single-story house is chosen for what it leaves out, no stair to climb and no upstairs nobody uses, so the roof span and the base matter more than the elevation.
- Roof trusses that clear the plan of interior support walls.
- An insulated floor cassette, so cold ground stays outside the rooms.
- One continuous level from the entrance to the garden doors.
- Door widths and a flush shower drawn for prams, wheelchairs and walking frames.
- Every pipe and cable under one plane, reached through a hatch.
Choose a configuration
A single-story house is chosen for what it leaves out, no stair to climb and no upstairs nobody uses, so the roof span and the base matter more than the elevation.
A roof that spans without interior walls
The roof does the work a staircase and a spine wall would do in a taller house: trusses or beams carry the full span, so the plan can run open from the entrance to the garden doors. Because nothing above needs support, partitions can be re-divided later without touching the frame, provided they are built as non-load-bearing from the start.
The floor is part of the insulation
In a single-story house the floor has as much exposed area as the roof, and cold ground pulls heat out through it all winter. The floor is built as an insulated cassette with the services inside it, so the slab or the raised base is separated from the rooms by a continuous layer instead of a screed laid straight onto the ground.
One level, no thresholds to trip on
The plan runs as a single sequence: entrance, living, a corridor serving the bedrooms, and a bathroom reachable from both the hall and the main bedroom. Door widths and turning space are drawn for a pram, a wheelchair or a walking frame, and the shower sits flush with the floor, because those details are cheap at drawing stage and costly afterwards. It is built for family homes, hotels and offices.
Services you can reach without opening a ceiling
With no upper floor, every pipe and cable lies under one plane, which turns maintenance into lifting a hatch rather than cutting a ceiling. The boiler, the manifold and the consumer unit sit together in a cupboard beside the kitchen, and drainage runs in straight lines to the outside wall.
Wide loads and a base that is ready first
A single-story house travels as long, low sections, and the route is checked before production for width, corners and overhead cables. The base is finished and level before the sections arrive, because a shallow building cannot absorb an uneven base the way a taller frame can.
Flat ground, or a slope handled in the base
On level ground the house sits close to the garden and the two read as one surface from the living room. Where the ground falls away, the difference is taken in the base: stub walls, a stepped slab or screw piles, with drainage and the access path decided at the same time so water never runs toward the doors.
| Storeys | 1 |
|---|
Included as standard
- Prefabricated structural frame
- Roof and wall panels
- Doors and glazing
- Insulation package
- Fastening system
- Numbered assembly drawings
Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.
Can a single-story house reach a plot with a narrow access road?
It can, but the delivery method changes: a panel kit arrives flat and can be carried in by a smaller vehicle, while closed room modules need a road wide enough for the load and a crane position at the boundary. The route is checked for width, turning circle and overhead lines before production, because a section built too wide cannot be trimmed at the gate. Send the access details with your enquiry and the kit is packed to suit.
Does a single-story house cost less to heat than a two-story one?
Not automatically: heat loss follows the area of the envelope, and a bungalow spreads the same floor area over a larger roof and a larger floor. The advantage comes from building that envelope well, especially the floor, and from keeping the plan compact instead of stretching it along the plot. A compact single-story house with an insulated floor cassette often performs better than a taller house with a cold ground floor.
Where does the laundry go in a single-story plan?
Usually in a utility corner off the kitchen or beside the back entrance, where water, waste and the outside door are close together. Without a basement or a garage loft, the washing machine, the dryer and the drying rack need a drawn position rather than a corner of the hallway. If the plan has a covered terrace, a drying line outside the utility door keeps the damp out of the house.
How is rainwater taken off a long single-story roof?
A long roof needs falls that are set in the structure rather than improvised on site, and enough outlets so water does not travel the whole length of a gutter. Valleys and changes of level are the places where leaves collect, so they get a wider outlet and an accessible cleaning point. On a plot with trees, the gutter detail matters as much as the roof covering.
Is a single-story house harder to keep cool in a hot climate?
The roof area is large, so the ceiling is where the heat comes in: a ventilated roof build-up, a reflective outer surface and insulation that continues over the wall heads all reduce the load. Shading the glazing and opening the plan for cross-ventilation at night do more than a larger air conditioner. In a hot climate the orientation of the long facade is worth deciding before the window sizes are fixed.
How long does it take to assemble a single-story prefab home?
Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.
What foundation does it need?
A concrete slab, strip footings or pier foundations are all suitable, depending on soil and local practice. We supply the connection details for each option, so your local builder can prepare the base while the kit is in production.
Can the layout be customised?
Yes — window positions, glazing size, the number of bedrooms and the balcony deck are adjusted before production. The kit ships numbered and pre-drilled for the plan you confirm, so late changes are the expensive kind. Finalise the plan with our advisors, then the factory cuts.