Now shipping to 40+ countries · CE & ISO-certified, factory-direct Get a quote in 24h →

Single-story prefab home kit with a galvanised steel frame

A single-story house is chosen for what it leaves out, no stair to climb and no upstairs nobody uses, so the roof span and the base matter more than the elevation.

Why this home
  • Roof trusses that clear the plan of interior support walls.
  • An insulated floor cassette, so cold ground stays outside the rooms.
  • One continuous level from the entrance to the garden doors.
  • Door widths and a flush shower drawn for prams, wheelchairs and walking frames.
  • Every pipe and cable under one plane, reached through a hatch.

Choose a configuration

From $320 / m² Factory-direct indicative price · exact quote after consultation
Factory-direct pricing Ships worldwide

A single-story house is chosen for what it leaves out, no stair to climb and no upstairs nobody uses, so the roof span and the base matter more than the elevation.

A roof that spans without interior walls

The roof does the work a staircase and a spine wall would do in a taller house: trusses or beams carry the full span, so the plan can run open from the entrance to the garden doors. Because nothing above needs support, partitions can be re-divided later without touching the frame, provided they are built as non-load-bearing from the start. The roof structure is carried on galvanised steel, with the truss span marked on the setting-out drawings.

The floor is part of the insulation

In a single-story house the floor has as much exposed area as the roof, and cold ground pulls heat out through it all winter. The floor is built as an insulated cassette with the services inside it, so the slab or the raised base is separated from the rooms by a continuous layer instead of a screed laid straight onto the ground.

One level, no thresholds to trip on

The plan runs as a single sequence: entrance, living, a corridor serving the bedrooms, and a bathroom reachable from both the hall and the main bedroom. Door widths and turning space are drawn for a pram, a wheelchair or a walking frame, and the shower sits flush with the floor, because those details are cheap at drawing stage and costly afterwards. It is built for villa projects, construction sites and hotels.

Services you can reach without opening a ceiling

With no upper floor, every pipe and cable lies under one plane, which turns maintenance into lifting a hatch rather than cutting a ceiling. The boiler, the manifold and the consumer unit sit together in a cupboard beside the kitchen, and drainage runs in straight lines to the outside wall.

Wide loads and a base that is ready first

A single-story house travels as long, low sections, and the route is checked before production for width, corners and overhead cables. The base is finished and level before the sections arrive, because a shallow building cannot absorb an uneven base the way a taller frame can.

Flat ground, or a slope handled in the base

On level ground the house sits close to the garden and the two read as one surface from the living room. Where the ground falls away, the difference is taken in the base: stub walls, a stepped slab or screw piles, with drainage and the access path decided at the same time so water never runs toward the doors.

Single-story prefab home kit with a galvanised steel frame — Specifications
Structuregalvanised steel
Storeys1
ColorsCustom colours
StyleModern

Included as standard

  • Prefabricated structural frame
  • Roof and wall panels
  • Doors and glazing
  • Insulation package
  • Fastening system
  • Numbered assembly drawings

Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.

Can a single-story prefab home be extended along the same line later?

Yes — the wall and roof systems repeat, so a further bay, a garage link or a bedroom wing joins the original frame with the same connection detail and the same numbered logic. Say early that an extension is likely: the drawings then reserve the fixing line and leave the roof junction open, and the base for the new part is prepared when you come to build it.

What holds up the installation day of a single-story prefab home?

A long, low building wants a straight approach and clear swing room for the crane, so overhead lines, garden walls and soft ground are the usual obstacles rather than the unit itself. Settle these with your advisor before the delivery date: the base has to be level and drained, the service tails have to wait at the right wall, and the lifting zone must be firm enough to carry the machine.

How long does it take to assemble a single-story prefab home?

Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.

What is the frame made of?

The structure is galvanised steel, with galvanised connections throughout. Wall and roof panels are insulated, and the floor is engineered for year-round living. Everything arrives pre-drilled and numbered, so the build is guided assembly rather than on-site carpentry.

What foundation does it need?

A concrete slab, strip footings or pier foundations are all suitable, depending on soil and local practice. We supply the connection details for each option, so your local builder can prepare the base while the kit is in production.

Can the layout be customised?

Yes — window positions, glazing size, the number of bedrooms and the balcony deck are adjusted before production. The kit ships numbered and pre-drilled for the plan you confirm, so late changes are the expensive kind. Finalise the plan with our advisors, then the factory cuts.

On a damp or sloping plot, should a single-story prefab home sit on a slab or be raised on piers?

Both work, and the choice turns on your ground and your services: a slab suits underfloor pipes and a perfectly level interior floor, while piers or pads suit sloping or slowly draining ground and leave a ventilated void beneath. Whichever you take, the drainage falls and the moisture barrier are planned together with it. Your advisor sizes the base detail from your level survey or soil report.

Can a single-story prefab home be designed without steps or raised thresholds?

Yes — it is a drawing decision: the entrance is set at ground level, internal openings are widened, and the bathroom is laid out as a wet room with a drained, level shower area. Ask for a plan without steps at the start, because thresholds, floor levels and turning spaces are far easier to resolve on paper than to retrofit. Where accessibility rules apply to your building, your local authority confirms what it expects.

Tell us your project.
We'll quote in 24 hours.

Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.

Reply within one business day NDA on request English · German · French · Spanish

Request a quote — Single-story prefab home kit with a galvanised steel frame