Single-story prefab home with level thresholds and living on one floor
A single-story house is chosen for what it leaves out, no stair to climb and no upstairs nobody uses, so the roof span and the base matter more than the elevation.
- Roof trusses that clear the plan of interior support walls.
- An insulated floor cassette, so cold ground stays outside the rooms.
- One continuous level from the entrance to the garden doors.
- Door widths and a flush shower drawn for prams, wheelchairs and walking frames.
- Every pipe and cable under one plane, reached through a hatch.
Choose a configuration
A single-story house is chosen for what it leaves out, no stair to climb and no upstairs nobody uses, so the roof span and the base matter more than the elevation.
A roof that spans without interior walls
The roof does the work a staircase and a spine wall would do in a taller house: trusses or beams carry the full span, so the plan can run open from the entrance to the garden doors. Because nothing above needs support, partitions can be re-divided later without touching the frame, provided they are built as non-load-bearing from the start.
The floor is part of the insulation
In a single-story house the floor has as much exposed area as the roof, and cold ground pulls heat out through it all winter. The floor is built as an insulated cassette with the services inside it, so the slab or the raised base is separated from the rooms by a continuous layer instead of a screed laid straight onto the ground.
One level, no thresholds to trip on
The plan runs as a single sequence: entrance, living, a corridor serving the bedrooms, and a bathroom reachable from both the hall and the main bedroom. Door widths and turning space are drawn for a pram, a wheelchair or a walking frame, and the shower sits flush with the floor, because those details are cheap at drawing stage and costly afterwards. The plan covers 17.9 m². The sleeping wing is 3 bedrooms, all on the same level. It is built for family homes, villa projects and hotels.
Services you can reach without opening a ceiling
With no upper floor, every pipe and cable lies under one plane, which turns maintenance into lifting a hatch rather than cutting a ceiling. The boiler, the manifold and the consumer unit sit together in a cupboard beside the kitchen, and drainage runs in straight lines to the outside wall.
Wide loads and a base that is ready first
A single-story house travels as long, low sections, and the route is checked before production for width, corners and overhead cables. The base is finished and level before the sections arrive, because a shallow building cannot absorb an uneven base the way a taller frame can.
Flat ground, or a slope handled in the base
On level ground the house sits close to the garden and the two read as one surface from the living room. Where the ground falls away, the difference is taken in the base: stub walls, a stepped slab or screw piles, with drainage and the access path decided at the same time so water never runs toward the doors.
| External size | 5,950 × 3,000 × 2,800 mm |
|---|---|
| Bedrooms | 3 bedrooms |
| Floor area | 17.9 m² |
| Storeys | 1 |
Included as standard
- Prefabricated structural frame
- Roof and wall panels
- Doors and glazing
- Insulation package
- Fastening system
- Numbered assembly drawings
Typical lead time: production 6–10 weeks, freight 3–6 weeks depending on destination port.
What holds up the installation day of a single-story prefab home?
A long, low building wants a straight approach and clear swing room for the crane, so overhead lines, garden walls and soft ground are the usual obstacles rather than the unit itself. Settle these with your advisor before the delivery date: the base has to be level and drained, the service tails have to wait at the right wall, and the lifting zone must be firm enough to carry the machine.
How wide can a single-story house be before it needs internal supports?
That is a question for the roof span, not for the walls: trusses and beams can cross a generous open plan, but every extra metre of span changes the depth of the member and the height of the roof zone. The usual approach is to keep the living space on one clear span and put the bedrooms behind a line of partitions that can carry a post if needed. Your advisor checks the span against the truss design before the plan is frozen.
How long does it take to assemble a single-story prefab home?
Most kits are weathertight within a few weeks of delivery: the frame and panels arrive prefabricated and the assembly crew works from numbered drawings. Interior finishing time depends on the configuration you choose. Count on 6–10 weeks of production plus 3–6 weeks of freight to your port before the kit lands.
What foundation does it need?
A concrete slab, strip footings or pier foundations are all suitable, depending on soil and local practice. We supply the connection details for each option, so your local builder can prepare the base while the kit is in production.
Can the layout be customised?
Yes — window positions, glazing size, the number of bedrooms and the balcony deck are adjusted before production. The kit ships numbered and pre-drilled for the plan you confirm, so late changes are the expensive kind. Finalise the plan with our advisors, then the factory cuts.
On a damp or sloping plot, should a single-story prefab home sit on a slab or be raised on piers?
Both work, and the choice turns on your ground and your services: a slab suits underfloor pipes and a perfectly level interior floor, while piers or pads suit sloping or slowly draining ground and leave a ventilated void beneath. Whichever you take, the drainage falls and the moisture barrier are planned together with it. Your advisor sizes the base detail from your level survey or soil report.
Can a single-story prefab home be designed without steps or raised thresholds?
Yes — it is a drawing decision: the entrance is set at ground level, internal openings are widened, and the bathroom is laid out as a wet room with a drained, level shower area. Ask for a plan without steps at the start, because thresholds, floor levels and turning spaces are far easier to resolve on paper than to retrofit. Where accessibility rules apply to your building, your local authority confirms what it expects.
How open can the plan be without an extra support wall?
The clear span is set by the roof structure rather than by taste: a one-storey plan works best when roof loads travel through a ring beam or a designed truss system sized for the width you want. Ask for a wide living space and the beam depth, the bearing points and any single post are fixed on the drawings before the wall panels are made, so the opening you picture is the opening that gets built.
Related models
Tell us your project.
We'll quote in 24 hours.
Tell us your site, timeline and configuration and we'll return a feasibility note, indicative budget and one to three recommended models.